My WebLink
|
Help
|
About
|
Sign Out
Home
2025-02-03 Letter from John Pipan Response to Comments & Proposed Conditions
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2025
>
2025-02-06 - Windward
>
Item #2 Teppy Mountain, LLC (PL-SPP-2024-000075)
>
2025-02-03 Letter from John Pipan Response to Comments & Proposed Conditions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:24:31 AM
Creation date
2/4/2025 7:23:29 AM
Metadata
Fields
Template:
Plan Doc Template
Description
2025-02-03 Teppy Mountain Response to Comments and Proposed Conditions Regarding Special Permit Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permit area and provide signage indicating the extent of the permit area for the duration of <br /> each event. <br /> Fencing the Special Permit area would require many miles of fencing at great cost and is <br /> unreasonable, especially given there are no permanent structures proposed associated with <br /> the permit. Any new fencing would also interfere with long established grazing rotation <br /> patterns across the property. As such, we recommend flagging be placed around the permit <br /> area for the duration of each event instead of fencing. <br /> 13. Within 180 days of the approval of this Special Permit, the Applicant shall either remove <br /> or declare an exemption from building permitting for agricultural structures pursuant to <br /> HRS 46-88, or secure building permits from the Department of Public Works-Building <br /> Division for all unpermitted structures in the heavy equipment rental base yard area. The <br /> Applicant shall finalize building permits within one (1)year thereafter. <br /> For agricultural structures, Hawaii Revised Statutes 46-88 provides for building permit <br /> exemptions in certain cases. We would like the proposed condition to account for that option <br /> as well. <br /> Thank you very much. <br /> Sincerely, <br /> John Pipan <br /> Planning Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.