My WebLink
|
Help
|
About
|
Sign Out
Home
2024-12-03 Noah Walin, Pacific Rim Land Inc. Testimony
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
2024
>
2024-12-05 Windward Continuance of Special General Plan Meeting
>
11-04-24 thru 12-4-24 - (57) Additional Individual Testimonies
>
2024-12-03 Noah Walin, Pacific Rim Land Inc. Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 11:30:18 AM
Creation date
12/4/2024 11:30:28 AM
Metadata
Fields
Template:
Plan Doc Template
Document Date
12/3/2024
Description
GP testimony
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br /> date of completion of the proposed quarrying; or its abandomnent, whichever <br /> comes first. <br /> in. An adequate supply of water shall be made available for dust control and for fire <br /> prevention and pre-suppression. <br /> n. Comply with all other laws, rules, regulations and requirements, including those <br /> of the Department of Health, Hawaii Electric Light Company, and the Department <br /> of Public Works. <br /> o. An annual monitoring report shall be submitted to the Planning Director and Land <br /> Use Commission prior to the anniversary date of the approval of this permit. The <br /> report shall include, but not be limited to, the amount of material quarried, a <br /> detailed listing of public complaints or problems and their disposition. Should a <br /> conflict arise, which cannot be mitigated or mediated,the quarry operations shall <br /> cease upon appropriate findings by the Planning Commission that the introduced <br /> use will have an adverse impact on surrounding properties. The report shall also <br /> include Applicant's progress in complying with the conditions imposed. <br /> p. An extension of time for the performance of conditions within the permit,with the <br /> exception of Condition No. 12,may be granted by the Planning Director upon the <br /> following circumstances: a)the non-performance is the result of conditions that <br /> could not have been foreseen or are beyond the control of the applicant, <br /> successors or assigns, and that are not the result of their fault or negligence; b) <br /> granting of the time extension would not be contrary to the general plan or zoning <br /> code; c) granting of the time extension would not be contrary to the original <br /> 12 <br /> SP92-381 Wailcoloa Development Company <br /> Decision And Order on Motion to Amend <br />
The URL can be used to link to this page
Your browser does not support the video tag.