My WebLink
|
Help
|
About
|
Sign Out
Home
2025-08-29 PL-CRC-2025-000034 Section 106 Consult Waikaumalo Stream Bridge Rehab Project
PublicDocuments
>
Planning Department
>
Cultural Resources Commission
>
Materials
>
2025
>
2025-10-08
>
Waikaumalo Stream Bridge Rehabilitation (PL-CRC-2025-000034)
>
2025-08-29 PL-CRC-2025-000034 Section 106 Consult Waikaumalo Stream Bridge Rehab Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 10:22:42 AM
Creation date
9/2/2025 9:45:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Matthew Clark, Chairperson HWY-DS 2.21046 <br /> August 28, 2025 <br /> Page 3 <br /> The APE is approximately 3.8 acres, located mostly within Hawaii Belt Road and is designated <br /> for working areas, construction staging, and material stockpiling. Most of the APE is located <br /> within the Hawaii Belt Road ROW (3-2-002:999). However, two parcels mauka of the highway <br /> ROW (3-2-002:029 and :032)will be used to access the foundations of the bridge and for <br /> staging. Vegetation clearing within the APE may be necessary to provide access to bridge <br /> foundations and stage equipment and materials. <br /> Identification of Historic Properties within the APE <br /> We welcome any information you may have on historical and cultural sites that have been <br /> recorded in or which you may have knowledge of within the proposed APE. In addition, if you <br /> are acquainted with any persons or organization that is knowledgeable about the proposed APE, <br /> or and descendants with ancestral, lineal or cultural ties to or cultural knowledge and/or historic <br /> properties information of or concerns for, and cultural or religious attachment to the proposed <br /> project area, we would appreciate receiving their names and contact information within 30 days <br /> of notice. <br /> Conclusion <br /> On behalf of FHWA, HDOT by way of this letter is notifying you of the proposed Waikaumalo <br /> Stream Bridge Rehabilitation Project. Should you want to participate in the Section 106 process, <br /> we request your written intent. Please also provide your comments on the proposed APE, any <br /> information you may have on cultural and/or historical sites that have been recorded within the <br /> APE, as well as the names and contact information of people/organizations who may have <br /> cultural affiliations and historical properties information in the vicinity of the proposed APE. <br /> We would appreciate a written response within thirty (30) days from date of receipt to our <br /> HDOT Project Manager, Andrew Hirano, at(808) 692-7546, from our Highways Desing Branch, <br /> Technical Design Services Section or by email at andrew.j.hirano@hawaii.gov or by mail to the <br /> State of Hawaii, Department of Transportation, 601 Kamokila Boulevard, Room 688, Kapolei, <br /> Hawaii 96707. <br /> Sincerely, <br /> HENRY KENNEDY <br /> Engineering Program Manager <br /> Design Branch <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.