Laserfiche WebLink
AECOM I County of Hawaii,Planning Department,Fiscal Year 2025-2026 <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> Brittany Obando 19.RELEVANT PROJECTS CONT. <br /> e. (1)TITLE AND LOCATION(City and State) See Project#6 in Section F (2)YEAR COMPLETED <br /> Kamehameha Highway, Rockfall Protection at Waimea Bay, Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Sunset Beach Side), RTE 83, MP 5.66-5.93(Honolulu, HI) Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm <br /> Lead Environmental Planning and Permitting for this project which involves replacing the existing 1,000-foot long rockfall impact fence <br /> (approximately 12-13 feet tall)along the Kamehameha Highway mauka shoulder with a new stronger rockfall impact fence(approximately 15 feet <br /> tall). Required permits and approvals include a NHPA Section 106 consultation, Endangered Species Act Section 7 consultation(USFWS and <br /> NMFS), National Environmental Policy Act(NEPA)Categorical Exclusion,and Magnuson-Stevens Act Essential Fish Habitat consultation. State- <br /> level permits and approvals include Hawaii Revised Statues(HRS)Chapter 6E-8 related to conserving and developing the historical and cultural <br /> properties within the state, HRS Chapter 195D related to conservation of forestry,wildlife,and aquatic resources,and coordination with the Office <br /> of Conservation and Coastal Lands. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PART I -PAGE 11 <br />