|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2025-2026
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.VV1TH CURRENT FIRM
<br /> Melia Waring Environmental Planner I 3 2
<br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> BS,Science Management N/A
<br /> Certification, Hazardous Waste Operations and Emergency Response
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Melia Waring is an Environmental Planner at AECOM,based in Honolulu, Hawaii.She recently graduated with honors from Pitzer College with
<br /> a degree in science management and a concentration in environmental science. Her background includes work with data/statistical analysis in
<br /> Microsoft Excel and projects related to climate change mitigation and ecology. She also has experience with the bioproduction industry from her
<br /> work in Keck Graduate Institute's Amgen Bioprocessing Center Lab. Her fieldwork experience has allowed her to gain familiarity with soil and water
<br /> sampling.
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State) See Project#4 in Section F (2)YEAR COMPLETED
<br /> Hawaii State Park System-wide Design Guidelines with Concepts and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Construction Drawings for Accessible Campsite Improvements (Statewide, HI) 2023-Ongoing 2025(est.)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLL Q Check if project performed with current firm
<br /> Environmental Planner supporting system-wide design guidelines and standards for Hawaii State Parks campgrounds. Support guidelines,site
<br /> visits,and project coordination.This multi-phase project will develop concept designs for ADA access and related improvements for campsites and
<br /> develop design guidelines and standards for future implementation across Hawaii State Parks campgrounds.
<br /> b. (1)TITLE AND LOCATION(City and State) See Project#3 in Section F (2)YEAR COMPLETED
<br /> Kamehameha Highway Shoreline Erosion and Mitigation in Kualoa,Kaaawa, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Punaluu,Hauula(Oahu,HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Staff, Environmental Support.The Kamehameha Highway Shoreline Erosion Mitigation in Kualoa, Kaaawa, Punaluu,and Hauula
<br /> Project would mitigate coastal erosion along nine discrete sections of the highway that the Hawaii Department of Transportation has identified as
<br /> needing action to maintain the usability of the highway in the near to mid-term, until a long-term plan to deal with the effects of sea level rise can
<br /> be developed and implemented.
<br /> c. (1)TITLE AND LOCATION(City and State) See Project#8 in Section F (2)YEAR COMPLETED
<br /> Mailiili Stream Bridge Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Waianae,Oahu, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner supporting various state and federal permitting efforts. Repairs to the Ma`ili`ili Stream Bridge are needed to maintain the
<br /> safety and reliability of the bridge for vehicular and pedestrian traffic.AECOM is providing professional engineering services and an exhaustive list
<br /> of environmental permitting services in accordance with Federal and State regulations including but not limited to NHPA Section 106 consultation,
<br /> Endangered Species Act Section 7 consultation(USFWS and NMFS), NEPA Categorical Exclusion,and Magnuson-Stevens Act Essential Fish
<br /> Habitat consultation, HRS Ch.343 Exemption Notice, SMA Permitting, Coastal Zone Management Consistency Determination, HRS Chapter 6E-8,
<br /> and HRS Chapter 195D.
<br /> d. (1)TITLE AND LOCATION(City and State) See Project#6 in Section F (2)YEAR COMPLETED
<br /> Kamehameha Highway, Rockfall Protection at Waimea Bay, Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Sunset Beach Side), RTE 83, MP 5.66-5.93(Oahu, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Project Staff, Environmental Support.The Kamehameha Highway Shoreline Erosion Mitigation in Kualoa, Ka`a`awa, Punalu`u,and Hauula
<br /> Project would mitigate coastal erosion along nine discrete sections of the highway that the Hawaii Department of Transportation has identified as
<br /> needing action to maintain the usability of the highway in the near to mid-term, until a long-term plan to deal with the effects of sea level rise can
<br /> be developed and implemented.
<br /> e. (1)TITLE AND LOCATION(City and State) See Project#7 in Section F (2)YEAR COMPLETED
<br /> Inventory of the Oahu Railway and Land(OR&L)Company Right-of-Way(ROW) PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Oahu, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Field Survey Team.Inventory of historic,extant character-defining features of the OR&L ROW for the National Register of Historic Places.
<br /> Compile historical data and archival data,execute field work and data monitoring.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 17
<br />
|