|
AECOM I County of Hawaii,Planning Department,Fiscal Year 2025-2026
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> A.TOTAL B.VV1TH CURRENT FIRM
<br /> Heidi Wellborn Environmental Planner
<br /> 22 2
<br /> 15.FIRM NAME AND LOCATION(City and State) AECOM Technical Services, Inc.(Honolulu, Hawaii)
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> BS, Natural Resources Management&Policy
<br /> Environmental Science Coursework
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Heidi Wellborn has almost 23 years of environmental compliance experience, Heidi Wellborn has obtained progressive environmental knowledge
<br /> spanning natural resource analysis,cultural resource analysis,environmental hazard analysis,and economic impact analysis. The primary focus
<br /> for 16 years of her career has been compliance with the National Environmental Policy Act(NEPA)and NEPA process management for military
<br /> construction and military installation programs. Heidi leverages critical thinking and analytical skills to provide NEPA project management for
<br /> actions requiring all levels of NEPA and Hawaii Environmental Policy Act analysis and documentation including environmental assessments(EAs)
<br /> and environmental impact statements(EISs). She is an effective communicator who distills complex, multi-source environmental impact data into
<br /> actionable insights.
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLE AND LOCATION(City and State See Project#4 in Section F (2)YEAR COMPLETED
<br /> Hawaii State Parks System-wide Design Guidelines with Concepts and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Construction Drawings for Accessible Campsite Improvements(Statewide, HI) 2023-Ongoing 2025-2026(est.)
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner and Deputy Project Manager supporting the contract for preparation of system-wide design guidelines and standards
<br /> for Hawaii State Parks campgrounds. Support guidelines,site visits,and project coordination.This multi-phase project will develop concept
<br /> designs for ADA access and related improvements for campsites and develop design guidelines and standards for future implementation across
<br /> Hawaii State Parks campgrounds.
<br /> b. (1)TITLE AND LOCATION(City and State) See Project#8 in Section F (2)YEAR COMPLETED
<br /> Lahaina Historic Building Restoration Master Plan PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Lahaina, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner supporting contract administration and technical review of the master planning study to initiate the reconstruction of eight
<br /> historic buildings destroyed by the August 2023 wildfire.The planning process included creation of a"roadmap"for efficient building restoration,
<br /> including workshops to refine building layouts,concept plans,permitting matrices,schedule and budget estimates,and agency pre-consultations.
<br /> c. (1)TITLE AND LOCATION(City and State) See Project#13 in Section F (2)YEAR COMPLETED
<br /> Mailiili Stream Bridge Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Waianar,Oahu, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Q Check if project performed with current firm
<br /> Environmental Planner supporting various state and federal permitting efforts. Repairs to the Ma`ili`ili Stream Bridge are needed to maintain the
<br /> safety and reliability of the bridge for vehicular and pedestrian traffic.AECOM is providing professional engineering services and an exhaustive list
<br /> of environmental permitting services in accordance with Federal and State regulations including but not limited to NHPA Section 106 consultation,
<br /> Endangered Species Act Section 7 consultation(USFWS and NMFS), NEPA Categorical Exclusion,and Magnuson-Stevens Act Essential Fish
<br /> Habitat consultation, HRS Ch.343 Exemption Notice, SMA Permitting, Coastal Zone Management Consistency Determination, HRS Chapter 6E-8,
<br /> and HRS Chapter 195D.
<br /> d. (1)TITLE AND LOCATION(City and State) See Project#6 in Section F (2)YEAR COMPLETED
<br /> Kamehameha Highway, Rockfall Protection at Waimea Bay, Phase 2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> (Sunset Beach Side), RTE 83, MP 5.66-5.93 (Honolulu, HI) Ongoing N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope.size,cost,eta.,...._ _ __,. C ROLE Q Check if project performed with current firm
<br /> Environmental Planner supporting environmental permits and draft consultation letters for this project which involves replacing the existing
<br /> 1,000-foot long rockfall impact fence(approximately 12-13 feet tall)along the Kamehameha Highway mauka shoulder with a new stronger
<br /> rockfall impact fence(approximately 15 feet tall). Required permits and approvals include a NHPA Section 106 consultation, Endangered Species
<br /> Act Section 7 consultation(USFWS and NMFS), National Environmental Policy Act(NEPA)Categorical Exclusion,and Magnuson-Stevens Act
<br /> Essential Fish Habitat consultation. State-level permits and approvals include Hawaii Revised Statues(HRS)Chapter 6E-8 related to conserving
<br /> and developing the historical and cultural properties within the state, HRS Chapter 195D related to conservation of forestry,wildlife,and aquatic
<br /> resources,and coordination with the Office of Conservation and Coastal Lands.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021)PART I -PAGE 18
<br />
|