|
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE
<br /> Ken C. Kawahara, P.E. President a.TOTAL b.WITH CURRENT FIRM
<br /> 33 15
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Akinaka &Associates, Ltd. — Honolulu, Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> University of Hawaii at Manoa, 1992, BS, Civil Engineering State of Hawaii, P.E., License#9148, 1997
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> ACEC, APWA, ASCE, SWWA, HCES, HLPC, WEF
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Makani Wind Pilot Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Waimea, Island of Hawaii, Hawaii 2014 Estimated 2019
<br /> 8 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Civil engineering support as well as project management for Google Inc. to deploy a 600kw Airborne Wind Turbine
<br /> prototype on land owned and operated by Parker Ranch. Project included 4 phases: Site selection &Environment Due
<br /> Diligence, Investigation &Environmental Compliance, Design &Construction and Construction &Testing Support
<br /> Services. Project Role: Principal project management
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Upcountry Maui Exploratory Potable Water Well PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Various Locations, Maui, Hawaii 2011 Estimated 2019
<br /> b.
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Engineering services including site identification, preparation of environmental assessment, constructions plans and
<br /> specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological
<br /> Sectors on the island of Maui. Project Role: Principal project management
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Waimea, Kauai, Hawaii 2017 N/A
<br /> C (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai.
<br /> Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie
<br /> and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP).
<br /> Project Role: Principal project management
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Water-Energy Nexus Investigation PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable)
<br /> Various Locations, Oahu, Hawaii 2015 N/A
<br /> d (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Analyze by user size,costs, energy intensity the energy needed to produce water/wastewater and water needs to produce
<br /> energy. Provide a benchmark for energy intensities and water intensities and identify opportunities and barriers to co-
<br /> implement water and energy efficiency program. Project also involved making recommendations for the development of
<br /> programs and policies to optimize water and wastewater systems. Project Role: Principal project management
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Upsizing of Lalamilo Well A PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Kamakoa, Island of Hawaii, Hawaii 2014 Estimated 2019
<br /> e (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm
<br /> Design improvements to a submersible 20 stage pump and motor or Line Shaft, 1,000 gpm pump and motor(replaces
<br /> 700 gpm pump and motor), new piping and appurtenances to accommodate larger pump and motor, new control
<br /> building, access road and sidewalks, site grading and demolition of existing building. Project Role: Principal project
<br /> management
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 2
<br />
|