Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> (Complete one Section E for each key person.) <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE <br /> Ken C. Kawahara, P.E. President a.TOTAL b.WITH CURRENT FIRM <br /> 33 15 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Akinaka &Associates, Ltd. — Honolulu, Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> University of Hawaii at Manoa, 1992, BS, Civil Engineering State of Hawaii, P.E., License#9148, 1997 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> ACEC, APWA, ASCE, SWWA, HCES, HLPC, WEF <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Makani Wind Pilot Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Waimea, Island of Hawaii, Hawaii 2014 Estimated 2019 <br /> 8 (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Civil engineering support as well as project management for Google Inc. to deploy a 600kw Airborne Wind Turbine <br /> prototype on land owned and operated by Parker Ranch. Project included 4 phases: Site selection &Environment Due <br /> Diligence, Investigation &Environmental Compliance, Design &Construction and Construction &Testing Support <br /> Services. Project Role: Principal project management <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Upcountry Maui Exploratory Potable Water Well PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Various Locations, Maui, Hawaii 2011 Estimated 2019 <br /> b. <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Engineering services including site identification, preparation of environmental assessment, constructions plans and <br /> specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological <br /> Sectors on the island of Maui. Project Role: Principal project management <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Waimea, Kauai, Hawaii 2017 N/A <br /> C (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai. <br /> Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie <br /> and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). <br /> Project Role: Principal project management <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Water-Energy Nexus Investigation PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) <br /> Various Locations, Oahu, Hawaii 2015 N/A <br /> d (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Analyze by user size,costs, energy intensity the energy needed to produce water/wastewater and water needs to produce <br /> energy. Provide a benchmark for energy intensities and water intensities and identify opportunities and barriers to co- <br /> implement water and energy efficiency program. Project also involved making recommendations for the development of <br /> programs and policies to optimize water and wastewater systems. Project Role: Principal project management <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Upsizing of Lalamilo Well A PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Kamakoa, Island of Hawaii, Hawaii 2014 Estimated 2019 <br /> e (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm <br /> Design improvements to a submersible 20 stage pump and motor or Line Shaft, 1,000 gpm pump and motor(replaces <br /> 700 gpm pump and motor), new piping and appurtenances to accommodate larger pump and motor, new control <br /> building, access road and sidewalks, site grading and demolition of existing building. Project Role: Principal project <br /> management <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 2 <br />