Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY <br /> (Complete one Section E for each key person.) <br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE <br /> Scott A. Kunioka, P.E. Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 39 8 <br /> 14.FIRM NAME AND LOCATION(City and State) <br /> Akinaka &Associates, Ltd. — Honolulu, Hawaii <br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> University of Hawaii at Manoa, 1986, BS, Civil Engineering State of Hawaii, P.E., License#7257, 1991 <br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Society of Civil Engineers, Hawaii Water Environment Association, UH Engineering Alumni Association <br /> 18. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Upcountry Maui Exploratory Potable Water Well 2011 Estimated 2018 <br /> Various Location, Maui, Hawaii <br /> a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Engineering services including site identification, preparation of environmental assessment, constructions plans and <br /> specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological <br /> Sectors on the island of Maui. Project Role: Project manager <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Waimea, Kauai, Hawaii 2017 N/A <br /> b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai. <br /> Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie <br /> and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP). <br /> Project Role: Project manager <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> First Insurance Center Drainage Improvements 2017 Estimated 2018 <br /> c. Honolulu, Hawaii <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Design the replacement of sidewalk culverts at four locations around the property, preparation of all documents <br /> necessary to obtain permits. Project Role: Project manager <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable) <br /> Kahului Airport MBR Scalping 2018 2020 <br /> Kahului, Maui, Hawaii <br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Extract wastewater from the sewer system and produce R-1 water for end users. Provide grading, erosion and sediment <br /> control, laydown and staging areas, asphalt surfacing and chain link fencing, paving removal, and trenching for <br /> underground piping and surface restoration. Project Role: Project manager <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> EIS East Maui Water Lease 2017 N/A <br /> e. Maui, Hawaii <br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Provide technical support for the EIS regarding the surface waterer and ground waters in the HC&S field system, <br /> Upcountry and Naiku areas in Maui. Project Role: Project manager <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 3 <br />