E. RESUMES OF KEY PERSONNEL PROPOSED WHO WILL PROVIDE SERVICES FOR THIS PROJECT CATEGORY
<br /> (Complete one Section E for each key person.)
<br /> 11.NAME 12.TITLE SERVICE PROVIDED 13.YEARS EXPERIENCE
<br /> Scott A. Kunioka, P.E. Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 39 8
<br /> 14.FIRM NAME AND LOCATION(City and State)
<br /> Akinaka &Associates, Ltd. — Honolulu, Hawaii
<br /> 15.EDUCATION(DEGREE AND SPECIALIZATION) 16.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> University of Hawaii at Manoa, 1986, BS, Civil Engineering State of Hawaii, P.E., License#7257, 1991
<br /> 17.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Society of Civil Engineers, Hawaii Water Environment Association, UH Engineering Alumni Association
<br /> 18. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Upcountry Maui Exploratory Potable Water Well 2011 Estimated 2018
<br /> Various Location, Maui, Hawaii
<br /> a. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Engineering services including site identification, preparation of environmental assessment, constructions plans and
<br /> specifications, permits, and construction services for an exploratory well site in the Makawao or Pukalani Hydrological
<br /> Sectors on the island of Maui. Project Role: Project manager
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Waimea Stream Diversion PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Waimea, Kauai, Hawaii 2017 N/A
<br /> b. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Design modifications to stream diversion at the Koaie Stream,Waiahulu Stream,and Waimea River on Kauai.
<br /> Preparation of conceptual designs to monitor stream &ditch flows and modify stream diversions as required at the Koaie
<br /> and Waiahulu streams, and the Waimea Tailrace (release structure) downstream of the Mauka Hydroelectric Plant(MHP).
<br /> Project Role: Project manager
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> First Insurance Center Drainage Improvements 2017 Estimated 2018
<br /> c. Honolulu, Hawaii
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Design the replacement of sidewalk culverts at four locations around the property, preparation of all documents
<br /> necessary to obtain permits. Project Role: Project manager
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> PROFESSIONAL SERVICES CONSTRUCTION (/fapplicable)
<br /> Kahului Airport MBR Scalping 2018 2020
<br /> Kahului, Maui, Hawaii
<br /> d. (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Extract wastewater from the sewer system and produce R-1 water for end users. Provide grading, erosion and sediment
<br /> control, laydown and staging areas, asphalt surfacing and chain link fencing, paving removal, and trenching for
<br /> underground piping and surface restoration. Project Role: Project manager
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> EIS East Maui Water Lease 2017 N/A
<br /> e. Maui, Hawaii
<br /> (3)BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Provide technical support for the EIS regarding the surface waterer and ground waters in the HC&S field system,
<br /> Upcountry and Naiku areas in Maui. Project Role: Project manager
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM REVISED 330 (1/13) PAGE 3