|
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Damon Hamura Principal a.TOTAL b.WITH CURRENT FIRM
<br /> 29 26
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawaii
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> B.S.E.,1995,Loyola Marymount University,Civil Engineering • Honolulu District,U.S.Army Corps of Engineers(USACE),
<br /> M.S.,Graduate Coursework,University of Hawaii at Manoa,Civil Engineering Construction Quality Management(CQM)for Contractors Certificate
<br /> • California,EIT Certification
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> • 40 Hour Initial/Current HAZWOPER(29 CFR 1910.120)Certificate • American Red Cross First Aid and CPR Certificate
<br /> • 8 Hour Supervisor/Mgr.HAZWOPER(29 CFR 1910.120)Certificate
<br /> 19.RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Commercial Harbors Environmental Compliance Support Services, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Department of Transportation-Harbors Division(Statewide,Hawaii) On-going
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Provided environmental engineering and compliance support services for the DOT-Harbors.Such services include but are not limited to soil and groundwater(e.g.
<br /> UST)investigations,storm drain outfall reconnaissance inventory and mapping,EMS and construction inspector training,tenant BMP and construction inspections,
<br /> public outreach and involvement,illicit discharge inspections,revisions to SWMPP,enhancement of Asset Management System(AMS),and assist with other
<br /> stormwater compliance.Program Manager.$400,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Consultant Services for Kapa'a Landfill Groundwater Monitoring Program,City& PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> County of Honolulu,Department of Environmental Services,(Honolulu,Hawaii) On-going
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b• Assisted with the management of the Kapa'a Landfill Groundwater Monitoring Program.Prepared an addendum to the existing groundwater monitoring plan to
<br /> address issues previously identified by the Hawaii Department of Health,Office of Solid Waste Management;replaced one defunct groundwater monitoring well and
<br /> installed up to three new groundwater monitoring wells;conducted groundwater and leachate sampling and analysis in accordance with the groundwater monitoring
<br /> plan/addendum;prepared an initial groundwater and leachate monitoring report;and assisted City&County of Honolulu,Department of Environmental Services
<br /> with the investigation of elevated leachate flows.Prepared two Alternative Source Investigations and an Updated Groundwater Monitoring Plan.To-date,ETC has
<br /> completed a total of 26 semi-annual monitoring events.Project Manager.$580,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Lead-Based Paint Inspection and Risk Assessment, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Hawaii Public Housing Authority(Statewide,Hawaii) 2024
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Contracted by the Hawaii Public Housing Authority to conduct lead-based paint inspections and risk assessments at 45 facilities located throughout the State of
<br /> Hawaii.The inspections were performed in accordance with the U.S.Department of Housing and Urban Development(HUD)standards by EPA-certified Lead Risk
<br /> Assessors utilizing field portable x-ray fluorescence(XRF)analyzers and resulted in over 77,000 lead readings.Program Manager.$1,160,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Initial Environmental Screening and Environmental Compliance Management, PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu Rail Transit Project,Maintenance and Storage Facility(Waipahu,Hawaii) 2016
<br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Managed an awarded contract by Kiewit-Kobayashi,A Joint Venture(KKJV)to provide environmental consulting and environmental compliance management
<br /> services.Assisted KKJV with FEIS/ROD compliance,contract-specific plan preparation,NPDES permit compliance,field environmental oversight,weekly and bi-
<br /> weekly reporting,environmental incident response,environmental compliance audit assistance,and interfacing with Honolulu Authority for Rapid Transit(HART)
<br /> personnel regarding environmental compliance issues.Environmental Compliance Manager.$280,000.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Environmental Engineering Services East Kapolei II Pesticide Mixing and PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Loading Site,Hawaii Department of Hawaiian Home Lands(Kapolei,Hawaii) 2015
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Prepared a Community Involvement Plan(CIP)and initiated dialog with members of the affected community to obtain input on the ultimate remedial alternatives,
<br /> e• identified potential hazardous materials existing on and within existing structures,managed and abated hazardous building materials,decontaminated/
<br /> decommissioned/disposed of existing aboveground storage and mixing tanks(9 total),demolished existing site structures,conducted additional characterization of site
<br /> soils to refine estimates of the magnitude and extent of contaminant impacts to site soils,identified environmental hazards posed by the existing site contamination,
<br /> identified and evaluated appropriate remedial alternatives to address contaminated media,solicited input from interested members of the public regarding preferred
<br /> remedial alternatives through a Public Notice and an informational open house,and provided planning and design for the selected remedial response action.
<br /> Subsequently,provided construction management services during implementation of the selected remedial response action,the implementation of confirmation
<br /> sampling,documentation of the remedial response action,and prepared an EHMP for long-term management of the remaining hazards.Project Manager.$720,000.
<br /> STANDARD FORM 330(REV.712021)
<br />
|