Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Mark Ohigashi, P.E. Sr.Civil/Environmental Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 15 3 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> EnviroServices&Training Center,LLC(ETC),Honolulu,Hawai`i <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> M.S.,2009,Stanford University,Civil and Environmental Engineering Hawaii,Registered Professional Civil Engineer(PE-17812) <br /> B.S.,2007,Loyola Marymount University,Civil Engineering <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> • 30-Hour OSHA Construction Safety and Health • Water Environment Federation-Hawaii Water Environment Association <br /> • 10-Hour USACE EM 385-1-1 Certification (Collection Systems Committee) <br /> • PSMJ A/E/C Project Management Bootcamp • American Council of Engineering Companies of Hawaii-Emerging Leaders <br /> • American Water Works Association-Hawaii Section(Current Treasurer) Program Cohort#2 <br /> • American Society of Civil Engineers-Hawaii Section Member <br /> 19.RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> EPA Compliance,Storm Water Management Program for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> State of Hawaii Department of Transportation(Honolulu,Hawaii) On-going <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> a. <br /> Engineering design and regulatory compliance services for the State of Hawaii Department of Transportation to address storm water management <br /> requirements mandated by the NPDES M54 Permit.Oversees engineering team support for the erosion control,erosional outfall,and permanent best <br /> management practices programs.Serves as design manager and subject matter expert for erosion control and permanent best management practices for <br /> stormwater quality.$36,000,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Miscellaneous Storm Drain Improvements Projects,State of Hawaii Department PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> of Transportation—Highways Division,Maui District(Kahului,Hawaii) On-going <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> b. <br /> Provides engineering design services for improvements to existing drainage structures of the HDOT Maui District MS4.Improvements included repair and <br /> raising existing grated inlets,raising existing manholes,pavement restoration,and repairing existing pipe connections.Also provided engineering design <br /> services in response to post-wildfire damage to highway stormwater and roadway infrastructure within HDOT right-of-way in and around Lahaina.Serves <br /> as design lead,design manager,and engineer of record. $25,000,000 <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lead and Copper Rules Revisions(LCRR)Compliance for the Island of 0`ahu, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu Board of Water Supply(Honolulu,Hawaii) On-going <br /> G (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Provide consultation for compliance with the Environmental Protection Agency's 2021 update to the Lead and Copper Rule(LCR).Provide field <br /> investigations to determine materials of water-utility and customer-owned lateral connections and provide customer tap sampling to determine lead and <br /> copper levels in the community to update and maintain the utility's Lead Service Line Inventory on the Island of 0`ahu.Project Manager.$1,270,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Environmental Engineering Services,Lead and Copper Rule Revisions(LCRR) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Compliance Assistance for Waiahole Valley Water System(Kaneohe,Hawaii) On-going <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Provide consultation for compliance with the Environmental Protection Agency's 2021 update to the Lead and Copper Rule(LCR).Provide field <br /> investigations to determine materials of water-utility and customer-owned lateral connections to develop and maintain the utility's Lead Service Line <br /> Inventory in the Waiahole Valley Water System.Provide LCRR Program Management.Project Manager.$1,326,000. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lahaina Fires Emergency Response-Stormwater Capture,Convey,and PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Treatment System,Hawaii Department of Transportation(Lahaina,Hawaii) 2024 <br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Provide consultation and preliminary design for a stormwater capture system using existing County of Maui drainage assets throughout the Lahaina burn <br /> zone.Also,provide a temporary aboveground conveyance system to deliver potentially contaminated stormwater to a converted lined drainage basin for <br /> treatment prior to discharge to the ocean.Project Manager.$1,250,000 <br /> STANDARD FORM 330(REV.7/2021) <br />