Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.EXAMPLE PROJECT KEY NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 2 <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Environmental Engineering and Consulting Services for Maui District MS4 Program, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Island of Maui(Wailuku,Hawaii) 2028 <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> State of Hawai`i,Department of Transportation-Highways Division Ty Fukuroku (808)873-3535 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) -sir '""" <br /> 44* <br /> EnviroServices&Training Center(ETC)was contracted to provide environmental compliance support to <br /> the State of Hawaii Department of Transportation(DOT),Highways Division,Maui District(HWY-M)to <br /> meet stormwater compliance requirements associated with their municipal separate storm sewer system w <br /> (MS4).Specifically,HWY-M was issued an MS4 NPDES Permit that required them to develop and <br /> implement control measures to prevent polluted runoff from entering and discharging from their MS4. = ASJ! �.. <br /> ETC helped to establish and implement the following: <br /> . <br /> Program Management-As part of the Water Environment Federation's annual National Stormwater <br /> and Green Infrastructure Awards,which recognizes high performing MS4 program throughout the <br /> country,the ETC/HWY-M team was awarded the 2023 MS4 Phase II Overall Award.This award is given <br /> to the single Phase II MS4 that demonstrates excellence in both Program Management and Innovation. <br /> "We're proud of each and every member of Highways Maui District's team for attaining this prestigious * , <br /> honor,which will serve as a model for other MS4s across the country,"said State of Hawaii Department <br /> of Transportation Deputy Director of Highways Robin Shishido. <br /> Mapping of MS4 Structures-ETC developed an inventory of M54 structures within the HWY-M M54 <br /> area and created GIS maps of the hundreds of structures,including inlets,manholes,pipes,culverts, <br /> outfalls,open channels,and junctions. <br /> Asset Management System-ETC designed an Asset Management System to identify and display <br /> the M54 network inventory,store assets and records,track task performance,schedule preventative <br /> maintenance and site inspections,create inspection and summary reports,and deliver program analytic. <br /> Public Education and Outreach-ETC developed public education and outreach programs,materials, <br /> and partnerships to provide stormwater awareness and training to targeted audiences that included Relevant Services <br /> HWY-M M54 users,contractors,DOT personnel,maintenance staff,industrial and commercial <br /> businesses,schools,and other stakeholders. <br /> Illicit Discharge Detection and Elimination-ETC developed and implemented procedures to respond Stormwater Compliance <br /> to detect and eliminate against illicit discharges and illegal connections that impact the HWY-M MS4, <br /> v_� Inspections <br /> including use of field investigations,industrial and commercial facility inspections,and outfall screening. <br /> Construction Best Management Practices-ETC developed and implemented construction plan review, Q_ Geographic Information <br /> inspection,and enforcement procedures to manage compliance with sediment and erosion control System(GIS) <br /> requirements on HWY-M construction projects. <br /> Post-Construction Best Management Practices-ETC developed and implemented procedures <br /> to inspect and maintain existing post-construction measures,in addition to review and ensure C Environmental <br /> implementation of new post-construction measures that mitigate stormwater runoff on HWY-M Engineering <br /> construction projects. ETC also participated in inter-governmental collaboration to revise the DOT Storm <br /> Water Post-Construction BMP Manual. <br /> Pollution Prevention and Good Housekeeping-ETC assisted in the development of contract <br /> bid specifications for the inspection and maintenance of MS4 structures and roadways.These bid In 2023,DOT Maui Highways <br /> specifications included requirements for drain inspection and cleaning,pipe inspection and cleaning,and was awarded the"MS4 Phase <br /> street sweeping. ETC also engineered plans,specifications,and estimates to repair erosional areas and II Overall Award"by the Water <br /> install low impact development(LID)assets. Environment Federation. <br /> Contract Amount: $25,000,000 <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center,LLC Wailuku,Hawai'J Prime Consultant <br /> STANDARD FORM 330(REV.712021) <br />