Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT 20.IEXAMPLE PROJECT IKEY NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified.Complete one Section F for each project.) 3 <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> Lahaina Post-Wildfire Stormwater Mitigation&Infrastructure Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> (Lahaina,Hawaii) On-going <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> State of Hawaii,Department of Transportation Ty Fukuroku (808)873-3535 <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope,size,and cost) <br /> Following the devastating August 2023 wildfires in Lahaina,EnviroServices&Training " <br /> Center(ETC)mobilized alongside the U.S.EPA,FEMA,Hawaii Department of Health, <br /> Maui County,the Federal Highway Administration,and Hawaii DOT—Highways Maui n'j `'" <br /> District(HWY-M)to safeguard coastal waters and rehabilitate roadway infrastructure. <br /> Rapid Response Contamination Mitigation <br /> As HWY-M's Stormwater Management Program Manager,ETC quickly and safely <br /> assessed the damage to DOT and Maui County infrastructure within the burn zone. <br /> Priority runoff areas with loose ash and soil were immediately identified were quickly �'�" •" <br /> stabilized with an environmentally safe soil tackifier by leveraging existing maintenance _ <br /> contracts.Simultaneously,ETC engineers assessed the State-owned and Federally- <br /> aided roadway segments that intersect the burn zone for rapidly available and easily <br /> deployable solutions to keep ash,heavy metals,and petroleum based pollutants out of = <br /> the storm drainage system and the Pacific Ocean.Through a combination of accelerated <br /> street sweeping,storm drain system cleaning,and deployment of customized <br /> Envirosoxx®for overland runoff filtration and inlet protection,our team successfully <br /> protected nearshore water quality. <br /> Stormwater Capture,Convey,and Treatment System <br /> As the winter rainy season quickly approached before potential burn zone pollutants <br /> could be completely stabilized or removed,ETC was asked to provide consultation and <br /> design a temporary stormwater treatment system that would collect contaminated <br /> runoff using the existing county drainage system.ETC engineers in collaboration with <br /> other partners designed a temporary aboveground conveyance system to divert upslope .— <br /> runoff to a geomembrane-lined basin converted from an existing drainage canal.The <br /> detained contaminated stormwater would then be treated using a customized modular <br /> treatment train system to remove suspended solids prior to discharge to the ocean. <br /> Permanent Drainage&Highway Rehabilitation Relevant Services <br /> ETC's civil and environmental engineers are currently advancing long-term <br /> infrastructure repairs within the HWY-M right-of-way.Complete plans,specifications, Civil Engineering <br /> and estimates have been produced to replace fire-damaged reinforced-concrete culverts <br /> and storm lines,raise and reconnect drainage structures,and repave or rehabilitate <br /> more than 12 miles of roadway along Honoapi`ilani Highway and connecting routes Rapid Response <br /> impacted by wildfire evacuations. Contamination Mitigation <br /> Contract Amount: $1,250,000 <br /> Stormwater Management <br /> Services <br /> 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. EnviroServices&Training Center,LLC Honolulu,Hawai'J Prime Consultant <br /> STANDARD FORM 330(REV.712021) <br />