My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-24 PL-INT-2025-010825 Uchiyama Erskine Architects - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-24 PL-INT-2025-010825 Uchiyama Erskine Architects - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:24:45 AM
Creation date
6/26/2025 11:29:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Samples <br /> County of Hawaii Office of Housing and Community <br /> Development - Ouli Ekahi Cottages Physical Needs <br /> Assessment <br /> Waimea, Hawaii <br /> r _ � <br /> 3 <br /> Uchiyama Erskine Architects (UEA) prepared a needs assessment report was completed,the <br /> Physical Needs Assessment Report for the needs- County requested that UEA provide services to <br /> based housing complex. The report was design the improvements to address the flooding <br /> developed based upon ASTM E2018-15 Standard issues and replace the wastewater treatment <br /> Guide for Property Condition Assessments. plant. <br /> Services included assessment of flooding issues <br /> impacting the parcel and several cottages along <br /> the perimeter,and retrofit of the housing complex <br /> wastewater treatment plant. In all, the interiors <br /> and exteriors of 33 cottages were assessed. The <br /> cottages included 28 duplex units, 3 single units <br /> and 2 accessible units, each with carports and Project Owner: County of Hawaii, Office of <br /> surrounding landscape. The assessment identified Housing and Community Development <br /> the areas needing repairs and/or improvements <br /> and was supplemented with rough-order- Project Cost:Assessment Only <br /> magnitude opinions of probable costs to address Project Size: +/-38,900 sq ft <br /> the areas of deficiencies, flooding issues and the <br /> Status: Complete <br /> wastewater treatment plant. After the physical <br />
The URL can be used to link to this page
Your browser does not support the video tag.