Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 2 <br /> agency,or 10 projects,if not specified. Complete one Section F for each project.) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Laupahoehoe Harbor Breakwater Repair Basis of Design PROFESSIONAL SERVICES CONSTRUCTION <br /> Laupahoehoe,Hawaii 2023 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> U.S. Army Corps of <br /> Cardno GS,Inc.—Ben Berridge 808-476-0067 <br /> Engineers <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Laupahoehoe Harbor is located on the Hamakua <br /> Coast on the northeast side of the Island of <br /> Hawaii, approximately 25 miles north- ,, <br /> northwest of Hilo. The facility includes a boat <br /> launch ramp and protective, 200-foot-long - — s IMP " �`°- - <br /> breakwater that was built in 1988. The usability — ." <br /> of the boat ramp has decreased since the facility n " <br /> was built and the breakwater has lost - '',Y y" <br /> fir. <br /> effectiveness in reducing wave energy at the sue' "y= .i <br /> boat ramp, decreasing functionality of the <br /> harbor. ,-' ` <br /> In 2019, USACE retained the services of <br /> Nagamine Okawa Engineers, Inc. and Sea �a ` a <br /> eln+bnV <br /> Engineering,Inc. (SE)to evaluate the condition . 'f' <br /> of the existing breakwater,develop and compare r` � <br /> alternative repair plans, and develop conceptual ,.,_. �,� '� i: <br /> �. <br /> repair plans and rough order of magnitude . '' �' , ,,. <br /> construction costs under the U.S. Army Corps �fr �` <br /> of Engineers (USACE) Operations & 'r 4, " :. <br /> °� <br /> Maintenance (O&M)program. <br /> In 2020,USACE retained the services of Cardno a , " o"1,-'--- `4 F `'` <br /> GS, Inc., and SE to develop the repair plan � ,"i-c,„ <br /> through final design. '4 L'`s <br /> 1 5;Z5- 'S, <br /> , <br /> ti.t � , <br /> GPA.P-IC G;,LE: as A q <br /> Cost: $141,640 <br /> fi FW.fl as RFi Arnr LO NIA' •'J'' i� Sex . <br /> ,a. " <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> E (City and State) <br /> Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />