Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 4 <br /> agency,or 10 projects,if not specified. Complete one Section F for each project.) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Pohoiki Boat Ramp Repair Relocation Study PROFESSIONAL SERVICES CONSTRUCTION <br /> Puna District, Island of Hawaii 2019 <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> State of Hawaii,DLNR Edward Underwood(DOBOR) 808-587-1966 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Hawaii Island's Kilauea Volcano <br /> 41, <br /> lower East Rift Zone began erupting on <br /> May 3, 2018, ultimately transforming , + ' N <br /> the landscape of the Lower Puna GRAPHIC <br /> SCALE <br /> district on the southeast coast of the <br /> island. When the eruption stopped in POHOIKI <br /> BOAT RAMP • <br /> August 2018 lava had covered more ;,;r; <br /> than 13 square miles of residential, 'fra • <br /> farm, industrial and natural lands, and '�'''�+ <br /> t' ra <br /> created some 875 acres of new land • <br /> extending into the ocean. At Pohoiki �' • ;.� s •C <br /> ' it° y, I <br /> Bay, site of the State DLNR-Division � sy- ti i{ ��i 4� <br /> of Boating and Ocean Recreation <br /> (DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and <br /> sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay <br /> was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach. <br /> Sea Engineering was contracted by the <br /> 'IWO Department of Land and Natural Resources, <br /> Division of Boating and Ocean Recreation, to <br /> prepare a concept screening study for re-opening <br /> the existing ramp facility or relocating it to an <br /> A - alternate site. The work involved coastal <br /> - " 47 engineering to develop concepts for evaluation, <br /> - and development of a rough-order-of-magnitude <br /> (ROM) construction cost estimate for the two <br /> concepts. Planning, design and permitting costs <br /> were also estimated. <br /> Cost: $43,960 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State) <br /> Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />