My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-25 PL-INT-2025-010828 Sea Engineering, Inc. - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:27:18 AM
Creation date
6/26/2025 8:18:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 5 <br /> agency,or 10 projects,if not specified Complete one Section F for each project) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> Waikoloa Beach Management Plan PROFESSIONAL SERVICES CONSTRUCTION <br /> Waikoloa,Hawaii 2017 to present <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> Waikoloa Beach Association Scott Head 808-886-1000 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Waikoloa Beach Resort is located on the west coast of 1 <br /> the island of Hawaii, and the southern portion <br /> encompasses the shoreline of Anaehoomalu Bay. <br /> During a tsunami in March 2011 the beach was severely P 44.70 <br /> eroded,a 200-foot-wide breach was created through the <br /> beach into the fishpond depositing sand in the pond,and <br /> a a <br /> much of the fishpond rock wall which acted as a <br /> backstop for the beach was destroyed. Following <br /> completion of repairs, the beach has been relatively <br /> stable,and the additional beach crest height has reduced <br /> wave overtopping. . <br /> 4 <br /> To ensure the continued stability of their beach, and <br /> address concerns about sea level rise, the Waikoloa <br /> Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long- <br /> term plan for management and maintenance of their valuable beach resource. Work includes Beach <br /> change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, <br /> development of a detailed beach maintenance/management plan,environmental assessment and permit <br /> application, and detailed design and construction documents. <br /> • <br /> ti <br /> PACIFIC OCEAN <br /> Cost: $12,560 <br /> (1)FIRM NAME (2)FIRM LOCATION (3)ROLE <br /> (City and State) <br /> Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.