Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 11 <br /> projects,if not specified Complete one Section F for each project) <br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED <br /> PROFESSIONAL CONSTRUCTION <br /> Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES <br /> Hilo,Hawaii 2015 n/a <br /> 23. PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL <br /> USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Scope: Tropical Storm Iselle hit the east side of Noterie=,oeo,tFestorm=H^azafaoueconaiiions^an=,Waeo,i-n=^— <br /> Hawaii Island at approximately 11:00 pm on August <br /> 7, 2014,with near hurricane force winds of 70 mph. <br /> Concerns that the Hilo Harbor channel would be 381, <br /> compromised by sunken debris or other obstructions LPM'me,:pram„ <br /> 8 PM Mon <br /> �s,a�ski <br /> due to the effects of the storm prompted harbor <br /> closure until a hydrographic survey could be eyed e. <br /> completed to verify that the channel was clear of °~ 8 PM Sun -- <br /> 8PMSat <br /> obstacles. Sea Engineering,Inc. (SE)was notified at „„,--„ „pM Thn <br /> approximately noon on August 7,2014,that a survey -z y , <br /> would be necessary the following day at Hilo Harbor. dMh.r, ' .. — ssa` ,d <br /> Tropical Storm Iselle Current Information. • Forecast Positions. <br /> Two survey engineers from Sea Engineering with :• ce°=er o=a,o°,a.oN s.,w •rroa calcvc aaeP°39Troo cal <br /> Max sa:,amea wma mv" sunamemph H 7 o< mon <br /> equipment flew to Hilo mid-morning on August 8 to Potential Track Area: curer Watches: twat, p Wa'73 95„,4„o mph n >„omoa <br /> conduct the survey. The survey was successfully o°av,-3� „av45 "er"`aae °ostorm "°'"`aae�rr°a.8,orm <br /> completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor <br /> was immediately re-opened. <br /> `` s 2'' 37 <br /> I � <br /> ,_" , J 13 Co <br /> 43 M l 38 / <br /> 14 f ) 13 13 <br /> �� 14 9 <br /> 39 38 3g sa 35 13 rnaer, 19 • 14 LATFORM g <br /> • 11 13 - _ <br /> pyr'y'li` Em.Lree 5�... `°e.�,eJ"..r• 4'r" 23 <br /> --'- rea:,MaAxs - <br /> 4.---ctor'61E' t', ''''' '"--,,,,7` AIA. -4,,,nii'1.r 1 ''‘ 36 <br /> ` <br /> I "42 <br /> �7,,,- ' 28 1` rr=v.. � .. tiM <br /> - - -- - _ e ua�s 31 <br /> 5 10 +d <br /> 5 IV rR 60 ANCHORAGE AREA h � <br /> 9. f°° 9 g 1 i 0.t28h(see note A} 8 g, k <br /> Rk <br /> F,d• 7 h 10 4i <br /> Scan sonar mosaic of Federal Project Area,Hilo Harbor <br /> Cost: $15,000 <br /> �� (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE <br /> -�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering <br />