F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
<br /> QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 11
<br /> projects,if not specified Complete one Section F for each project)
<br /> 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
<br /> PROFESSIONAL CONSTRUCTION
<br /> Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES
<br /> Hilo,Hawaii 2015 n/a
<br /> 23. PROJECT OWNER'S INFORMATION
<br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
<br /> USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370
<br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
<br /> Scope: Tropical Storm Iselle hit the east side of Noterie=,oeo,tFestorm=H^azafaoueconaiiions^an=,Waeo,i-n=^—
<br /> Hawaii Island at approximately 11:00 pm on August
<br /> 7, 2014,with near hurricane force winds of 70 mph.
<br /> Concerns that the Hilo Harbor channel would be 381,
<br /> compromised by sunken debris or other obstructions LPM'me,:pram„
<br /> 8 PM Mon
<br /> �s,a�ski
<br /> due to the effects of the storm prompted harbor
<br /> closure until a hydrographic survey could be eyed e.
<br /> completed to verify that the channel was clear of °~ 8 PM Sun --
<br /> 8PMSat
<br /> obstacles. Sea Engineering,Inc. (SE)was notified at „„,--„ „pM Thn
<br /> approximately noon on August 7,2014,that a survey -z y ,
<br /> would be necessary the following day at Hilo Harbor. dMh.r, ' .. — ssa` ,d
<br /> Tropical Storm Iselle Current Information. • Forecast Positions.
<br /> Two survey engineers from Sea Engineering with :• ce°=er o=a,o°,a.oN s.,w •rroa calcvc aaeP°39Troo cal
<br /> Max sa:,amea wma mv" sunamemph H 7 o< mon
<br /> equipment flew to Hilo mid-morning on August 8 to Potential Track Area: curer Watches: twat, p Wa'73 95„,4„o mph n >„omoa
<br /> conduct the survey. The survey was successfully o°av,-3� „av45 "er"`aae °ostorm "°'"`aae�rr°a.8,orm
<br /> completed,and results were communicated to the USACOE-POH at 7:00 pm on August 8,2014.The Harbor
<br /> was immediately re-opened.
<br /> `` s 2'' 37
<br /> I �
<br /> ,_" , J 13 Co
<br /> 43 M l 38 /
<br /> 14 f ) 13 13
<br /> �� 14 9
<br /> 39 38 3g sa 35 13 rnaer, 19 • 14 LATFORM g
<br /> • 11 13 - _
<br /> pyr'y'li` Em.Lree 5�... `°e.�,eJ"..r• 4'r" 23
<br /> --'- rea:,MaAxs -
<br /> 4.---ctor'61E' t', ''''' '"--,,,,7` AIA. -4,,,nii'1.r 1 ''‘ 36
<br /> `
<br /> I "42
<br /> �7,,,- ' 28 1` rr=v.. � .. tiM
<br /> - - -- - _ e ua�s 31
<br /> 5 10 +d
<br /> 5 IV rR 60 ANCHORAGE AREA h �
<br /> 9. f°° 9 g 1 i 0.t28h(see note A} 8 g, k
<br /> Rk
<br /> F,d• 7 h 10 4i
<br /> Scan sonar mosaic of Federal Project Area,Hilo Harbor
<br /> Cost: $15,000
<br /> �� (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
<br /> -�iI�JC Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
<br />
|