|
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> a. TOTAL b. WITH FIRM
<br /> Marc Ericksen,Senior Executive Officer Project Manager 34 34
<br /> 15. FIRM NAME and LOCATION(City and State)
<br /> Sea Engineering,Inc.
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> M.S.Coastal Geology
<br /> B.S.Earth Sciences
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.)
<br /> Member—ASCE,MTS,ACECH,SAME,WEDA,WEF,ASBPA
<br /> Certified Hydrographer—National Society of Professional Surveyors/Hydrographic Society of America
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> HIC-2 Interisland Cable Route Bathymetry and Biological Surveys
<br /> Oahu,Molokai,Maui,and Hawaii Island 2024 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm
<br /> a. Hawaiian Telcom is proposing to establish the Hawaii Interconnector Cable 2 (HIC-2) submarine fiber optic cable system
<br /> connecting Kauai,Oahu,Molokai,Maui and Hawaii. In support of the planning,design and environmental permitting for the
<br /> proposed cable system,Sea Engineering,Inc.(SE)has been contracted by RM Towill and Hawaiian Telcom to conduct towed
<br /> camera,bathymetry,and marine biological surveys of the proposed cable landing sites.
<br /> Cost: $$1,320,620.00 Role:Project Manager
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kalihiwai Stream Hydrographic Survey Professional Services Construction
<br /> Kauai,Hawaii 2024 to present n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> b. Sea Engineering,Inc.(SE)has been contracted by Park Engineering and the State of Hawaii Department of Transportation to
<br /> provide a multibeam hydrographic survey of the Kalihiwai Stream in support of scour repairs at Kalihiwai River Bridge.The
<br /> survey extends from the stream mouth to the plunge pool upstream of Kalihiwai Bridge,roughly 4500 feet.Survey deliverables
<br /> include an xyz file of the data,contour,and color-coded charts of stream depths.
<br /> Cost: $66,400 Role:Project Manger
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Laupahoehoe Biological Surveys and Environmental Support Professional Services Construction
<br /> Laupahoehoe,Hawaii 2022 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> c. Sea Engineering,Inc.,was contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine
<br /> environment within and adjacent to the Laupahoehoe Harbor breakwater.Work tasks include generating habitat maps,conduct
<br /> quantitative surveys, develop a report presenting key findings and providing qualitative information that characterizes
<br /> presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species.
<br /> Cost: $38,036 Role:Project Manager
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Mokapu Ocean Outfall NPDES Oceanographic Measurements
<br /> Kaneohe,Hawaii 2020 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> In support of the City and County of Honolulu's NPDES permit requirements to conduct oceanographic measurements for the
<br /> d. Kailua Regional Wastewater Treatment Plant Mokapu ocean outfall, Sea Engineering, Inc. (SEI) was responsible for
<br /> deployment of 2 acoustic Doppler current profilers for a 1-year period, collection of water samples, CTD profiles, diver
<br /> reconnaissance of proposed buoy anchor locations,fabrication of buoy sensor mounting platforms,and deployment/inspection
<br /> of two scientific monitoring buoys in the outfall vicinity.
<br /> Cost: $200,000 Role:Project Manager
<br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
<br /> Flilo WWTP Outfall Inspection
<br /> Hilo,Hawaii 2018 n/a
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm
<br /> e. Sea Engineering,Inc.(SE)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of
<br /> the Hilo Wastewater Treatment Plant(WWTP) outfall. SE performed inspections on the outfall in 1987, 1990, 2001, 2005,
<br /> 2011,and 2012 and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and
<br /> covered the submerged length of the outfall.
<br /> Cost: $22,400 Role:Project Manager
<br />
|