Laserfiche WebLink
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> a. TOTAL b. WITH FIRM <br /> Marc Ericksen,Senior Executive Officer Project Manager 34 34 <br /> 15. FIRM NAME and LOCATION(City and State) <br /> Sea Engineering,Inc. <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> M.S.Coastal Geology <br /> B.S.Earth Sciences <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.) <br /> Member—ASCE,MTS,ACECH,SAME,WEDA,WEF,ASBPA <br /> Certified Hydrographer—National Society of Professional Surveyors/Hydrographic Society of America <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> HIC-2 Interisland Cable Route Bathymetry and Biological Surveys <br /> Oahu,Molokai,Maui,and Hawaii Island 2024 to present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE IE Check if project performed with current firm <br /> a. Hawaiian Telcom is proposing to establish the Hawaii Interconnector Cable 2 (HIC-2) submarine fiber optic cable system <br /> connecting Kauai,Oahu,Molokai,Maui and Hawaii. In support of the planning,design and environmental permitting for the <br /> proposed cable system,Sea Engineering,Inc.(SE)has been contracted by RM Towill and Hawaiian Telcom to conduct towed <br /> camera,bathymetry,and marine biological surveys of the proposed cable landing sites. <br /> Cost: $$1,320,620.00 Role:Project Manager <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Kalihiwai Stream Hydrographic Survey Professional Services Construction <br /> Kauai,Hawaii 2024 to present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm <br /> b. Sea Engineering,Inc.(SE)has been contracted by Park Engineering and the State of Hawaii Department of Transportation to <br /> provide a multibeam hydrographic survey of the Kalihiwai Stream in support of scour repairs at Kalihiwai River Bridge.The <br /> survey extends from the stream mouth to the plunge pool upstream of Kalihiwai Bridge,roughly 4500 feet.Survey deliverables <br /> include an xyz file of the data,contour,and color-coded charts of stream depths. <br /> Cost: $66,400 Role:Project Manger <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Laupahoehoe Biological Surveys and Environmental Support Professional Services Construction <br /> Laupahoehoe,Hawaii 2022 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm <br /> c. Sea Engineering,Inc.,was contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine <br /> environment within and adjacent to the Laupahoehoe Harbor breakwater.Work tasks include generating habitat maps,conduct <br /> quantitative surveys, develop a report presenting key findings and providing qualitative information that characterizes <br /> presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species. <br /> Cost: $38,036 Role:Project Manager <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Mokapu Ocean Outfall NPDES Oceanographic Measurements <br /> Kaneohe,Hawaii 2020 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm <br /> In support of the City and County of Honolulu's NPDES permit requirements to conduct oceanographic measurements for the <br /> d. Kailua Regional Wastewater Treatment Plant Mokapu ocean outfall, Sea Engineering, Inc. (SEI) was responsible for <br /> deployment of 2 acoustic Doppler current profilers for a 1-year period, collection of water samples, CTD profiles, diver <br /> reconnaissance of proposed buoy anchor locations,fabrication of buoy sensor mounting platforms,and deployment/inspection <br /> of two scientific monitoring buoys in the outfall vicinity. <br /> Cost: $200,000 Role:Project Manager <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Flilo WWTP Outfall Inspection <br /> Hilo,Hawaii 2018 n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE El Check if project performed with current firm <br /> e. Sea Engineering,Inc.(SE)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of <br /> the Hilo Wastewater Treatment Plant(WWTP) outfall. SE performed inspections on the outfall in 1987, 1990, 2001, 2005, <br /> 2011,and 2012 and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and <br /> covered the submerged length of the outfall. <br /> Cost: $22,400 Role:Project Manager <br />