Laserfiche WebLink
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> a. TOTAL b. WITH THIS FIRM <br /> Ian Hardy Ocean Engineer 8 8 <br /> 15.FIRM NAME and LOCATION(City and State) <br /> Sea Engineering,Inc. <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> M.S.University of Hawaii-Manoa,Ocean and Resources <br /> Engineering <br /> B.A.Sc.,University of British Columbia,Civil Engineering <br /> Dip.Tech.,Camosun College,Civil Engineering Technology <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> AAUS Scientific Diver <br /> Boater Safety Course <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Kamehameha Highway Shoreline Erosion Mitigation Professional Services Construction <br /> Kaaawa,Oahu 2020 to present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm <br /> a. Sea Engineering, Inc. has been contracted by AECOM for HDOT Highways Division to assist with implementation of <br /> temporary erosion protection for Kamehameha Highway at Kaaawa,Oahu.Work tasks include preparation of a basis of design <br /> report,an environmental assessment,construction drawings for selected plan,the Department of the Army permit application, <br /> as well as community outreach. <br /> Cost: $3640,710 Role:Ocean Engineer <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Route 50 Kauai Sea Level Rise Feasibility Study Professional Services Construction <br /> Kauai,Hawaii 2023 to Present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm <br /> Sea Engineering, Inc. (SE)has been contracted by Bowers Kubota and the State of Hawaii Department of Transportation to <br /> b. evaluate coastal hazards, sea level rise vulnerability, and wave flooding for different resiliency alternatives in the Route 50 <br /> project area. Work tasks include field investigations, reviewing existing available information, overview of sea level rise <br /> projections,high-resolution sea-level rise and wave inundation modeling for future sea level rise scenarios,evaluation of coastal <br /> mitigation and resiliency alternatives,and a detailed report presenting the results. <br /> Cost: $71,700 Role:Project Manager/Ocean Engineer <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Sea Level Rise Wave Inundation Study,Honoapiilani Highway Realignment Professional Services Construction <br /> Honoapiilani Highway—Olowalu and Ukumehame,Maui,Hawaii 2023 to present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm <br /> Sea Engineering,Inc.(SE)has been contracted by WSP and by the State of Hawaii Department of Transportation to conduct a <br /> c. sea level rise (sir) and wave inundation study for proposed roadway alignment alternatives along Honoapiilani Highway at <br /> Ukumehame and Olowalu, Maui. Project tasks include a comprehensive summary of the current SLR projections,review of <br /> the Hawaii sea level rise exposure area(SLR-XA),numerical modeling of wave induced flooding for future sea level of 0.98 m <br /> (3.2 ft)for existing topography and a summary of project area FEMA flood hazard zones. <br /> Cost: $58,350 Role;Ocean Engineer <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Sea level Rise Inundation and ASCE Tsunami Analyses-Kalaeloa Facility Professional Services Construction <br /> Kalaeloa,Hawaii 2023 to present n/a <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm <br /> Sea Engineering has been contracted by PERC Water Corporation to conduct a sea level rise (SLR)flooding hazard analyses <br /> d. and ASCE tsunami flow analyses for the proposed Kalaeloa Seawater Desalination Facility. The proposed scope of work <br /> includes assessment of natural hazards associated with 100-year wave/storm events and tsunamis while incorporating sea level <br /> rise. In addition, tsunami flow depths and velocities were determined for the project site at proposed structure locations per <br /> ASCE7-16 design guidelines in support of structural design for tsunami loads. <br /> Cost:$109,922 Role:Ocean Engineer <br /> (1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED <br /> Magic Island Lagoon Retaining Wall and Walkway Improvements Professional Services Construction <br /> Honolulu,Hawaii 2025 n/a <br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm <br /> Sea Engineering, Inc. (SE) was contracted by the City and County of Honolulu to provide project management, permitting, <br /> plans,specifications,and contract documents for design of repairs of the CRM seawall and replacement of the walkway. <br /> Cost: $405,000 Role:Ocean Engineer <br />