Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Brian Lock, P.E. Sr. Vice President& Principal a.TOTAL b.WITH CURRENT FIRM <br /> 30 22 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1994 PE, 9867, Hawaii, Civil Engineering, 1999 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> American Society of Civil Engineers <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Auahi Promenade Phases 1 &2,Ward Village PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Oahu, HI Phase 1 Design-2021 Phase 1 —2024 <br /> Phase 2 Design — Phase 2—under <br /> 7/2024/Active construction <br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly <br /> 2-lane road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes <br /> constructing near existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops.A <br /> relocated mid-block crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street.Associated design <br /> includes a new signalized intersection at Ward Ave, grading, curb ramp, landscaping, bike lanes with buffers, pavement marking <br /> and signs,water meter adjustments, and fire hydrant relocations <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> HDOT Harbors Oahu District Baseyard Relocation to Auiki Street <br /> Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The existing baseyard is located along the coastline and is being impacted by rising sea levels. HDOT is proposing to relocate its <br /> Oahu District Baseyard to Auiki Street. Brian is Project Manager overseeing the development of site layout alternatives and the <br /> civil design for the preferred concept. The project focuses on accommodating and consolidating HDOT-Harbors baseyard <br /> departments into a single facility with shared spaces, maintenance areas, and parking to accommodate Government Vehicles and <br /> staff parking. Est. Construction Cost: $43M (demolition and relocation) <br /> (1)TITLE AND LOCATION(City and State) <br /> (2)YEAR COMPLETED <br /> P-935 Electrical Distribution Modernization <br /> Marine Corps Base Hawaii, Kaneohe, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Design—10/2024 Pending Advertising <br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Lead Civil Engineer responsible for overseeing the preparation of civil plans and specifications for demolition, erosion control, <br /> traffic control, site improvements supporting equipment pads, and restoration of pavements and landscape for the underground <br /> duct bank system. The Design-Bid-Build project replaces obsolete switching stations; relocates primary distribution circuits and <br /> associated equipment from overhead to underground, including communication lines. Construction Cost: about$50M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Keaau-Pahoa Road Shoulder Improvements, Phases 1 &2 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Puna, Hawaii Phase 1 —2015 Phase 1 -2015 <br /> Phase 2-2018 Phase 2—2018 <br /> d• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the design of the widening of a 2-mile portion if Keaau-Pahoa Road by installing an additional northbound lane; <br /> widening Waipahoehoe Bridge; extending existing culverts; and installing pavement marking, striping and signing. The project <br /> converted the shoulder lane into a permanent travel lane. Drainage improvements included lengthening and repair/replacement of <br /> existing culverts, and the installation of a new culvert to alleviate flooding conditions. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 9 <br />