Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Glenn Kuwaye, P.E., LEED AP Sr. Vice President & Principal a.TOTAL b.WITH CURRENT FIRM <br /> 25 20 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Santa Clara University, 2000 LEED Accredited Professional, 2009 <br /> PE-11817, Hawaii, Civil Engineering, 2005 <br /> PE-65310, California, Civil Engineer, 2003 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Member, Japanese Chamber of Commerce <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Aeo&Whole Foods,Ward Village <br /> Kakaako, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2018 2018 <br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project manager for the preparation of construction plan for a new residential tower and Whole Foods in Kakaako. The roadway <br /> and sidewalk improvements for the project included re-construction of the existing sidewalks along Queen Street, Kamakee Street, <br /> and Robinson Way (private street) fronting the project site including repaving of the project half of the roadways. Other street <br /> improvements included driveways at Queen Street and Robinson Way,ADA curb ramps at the intersections,striping,street lighting, <br /> and landscaping. ECC: $430M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Salt Lake/Moanalua Public Library—Parking Lot Improvements <br /> Moanalua, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> b. 2020 2020 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of construction plans for demolition,site layout, and striping for the repaving of existing parking <br /> lot. The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC: $250K <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hale Mahana Student Housing PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, HI 2018 2018 <br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of construction plans for a new student housing development at the corner of South King Street <br /> and University. Civil scope included the preparation of a due diligence study, plans for demolition, mass grading, water, sewer, <br /> ingress and egress, drainage,and traffic signals. WOC also prepared and processed a NPDES Permit,storm drainage connection <br /> agreement, storm water quality report, and erosion control report. ECC: $72 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimano Ridge Site Water System Improvements,Assessment <br /> and Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pearl City, Oahu, HI 2016 2016 <br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager and Senior Civil Engineer for the design of upgrades to an existing water system, owned by the Department of <br /> Health (DOH) and maintained under contract by the Board of Water Supply (BWS. Improvements to the system included the <br /> upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet <br /> BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear feet <br /> of access driveway to the water tank and the installation of 23 fire hydrants,water meters and back-flow preventers. ECC: $6 Million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 10 <br />