E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Glenn Kuwaye, P.E., LEED AP Sr. Vice President & Principal a.TOTAL b.WITH CURRENT FIRM
<br /> 25 20
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, Santa Clara University, 2000 LEED Accredited Professional, 2009
<br /> PE-11817, Hawaii, Civil Engineering, 2005
<br /> PE-65310, California, Civil Engineer, 2003
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Member, Japanese Chamber of Commerce
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Aeo&Whole Foods,Ward Village
<br /> Kakaako, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2018 2018
<br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project manager for the preparation of construction plan for a new residential tower and Whole Foods in Kakaako. The roadway
<br /> and sidewalk improvements for the project included re-construction of the existing sidewalks along Queen Street, Kamakee Street,
<br /> and Robinson Way (private street) fronting the project site including repaving of the project half of the roadways. Other street
<br /> improvements included driveways at Queen Street and Robinson Way,ADA curb ramps at the intersections,striping,street lighting,
<br /> and landscaping. ECC: $430M
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Salt Lake/Moanalua Public Library—Parking Lot Improvements
<br /> Moanalua, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> b. 2020 2020
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for demolition,site layout, and striping for the repaving of existing parking
<br /> lot. The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC: $250K
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Hale Mahana Student Housing PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Honolulu, HI 2018 2018
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for a new student housing development at the corner of South King Street
<br /> and University. Civil scope included the preparation of a due diligence study, plans for demolition, mass grading, water, sewer,
<br /> ingress and egress, drainage,and traffic signals. WOC also prepared and processed a NPDES Permit,storm drainage connection
<br /> agreement, storm water quality report, and erosion control report. ECC: $72 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waimano Ridge Site Water System Improvements,Assessment
<br /> and Design PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Pearl City, Oahu, HI 2016 2016
<br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager and Senior Civil Engineer for the design of upgrades to an existing water system, owned by the Department of
<br /> Health (DOH) and maintained under contract by the Board of Water Supply (BWS. Improvements to the system included the
<br /> upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet
<br /> BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear feet
<br /> of access driveway to the water tank and the installation of 23 fire hydrants,water meters and back-flow preventers. ECC: $6 Million
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 10
<br />
|