My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-25 PL-INT-2025-010829 Wilson Okamoto Corporation - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-25 PL-INT-2025-010829 Wilson Okamoto Corporation - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 8:41:35 AM
Creation date
6/26/2025 8:35:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Hugh Brady Environmental Planner/Project a.TOTAL b.WITH CURRENT FIRM <br /> Coordinator 1 1 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.A., University of Pennsylvania, College of Arts&Sciences, 2024 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pulehunui Community Development District(Design-Build) <br /> Puunene, Maui, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ElCheck if project performed with current firm <br /> The Hawaii Community Development Authority(HCDA) is proposing to plan, design and construct infrastructure needed for the <br /> development of the Pulehunui Community Development District on the island of Maui. Hugh is assisting with the preparation of <br /> the Planning Assessment Report, a critical deliverable for the project. Several planning reports have been prepared by various <br /> agencies in the past. His tasks includes reviewing available documents/resources and identify potential alignment and deficiencies <br /> between existing federal, state and county planning studies/assessments. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kapalama-lwilei Electrical Infrastructure Improvements(Design-Build) <br /> Kapalama, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active -- <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The Hawaii Community Development Authority (HCDA) is proposing to plan, design and construct electrical infrastructure <br /> improvements in the lwilei-Kapalama area on the island of Oahu. Hugh is assisting with preparation of the Planning Assessment <br /> Report, an existing conditions report that will eventually support the environmental review process. He is also actively involved in <br /> the initial state of the Environmental Assessment process, preparing the Earl Consultation Package. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waipahu-Pearl City Sewer Trunk Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Pearl City, Oahu, HI EA-Active -- <br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The City&County of Honolulu is proposing a new gravity sewer line to convey sewer flows between Pearl City Pump Station and <br /> the Waipahu Pump Station, a distance of about 2.2 miles. The sewer line is proposed to be constructed using the micro-tunneling <br /> method. Hugh is assisting with the preparation and processing of the Environmental assessment, pursuant to Chapter 343, HRS. <br /> In addition, he coordinated early consultation with various federal, state and county agencies; elected officials; and stakeholders <br /> to solicit comment and areas of concern. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Grand Hyatt Kauai PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Koloa, Kauai, HI Active -- <br /> d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The Grand Hyatt Kauai is proposing addition of two new suits which would put the hotel at more units then what was previously <br /> entitled. As a result Hugh is involved in various aspects, including SMA compliance, Shoreline Setback considerations, and <br /> application for a public sidewalk across Poipu Road. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.