|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Rachel Lavatai Environmental Planner/Project Coordinator a.TOTAL b.WITH CURRENT FIRM
<br /> 1 1
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> MSL, Environmental Law, Lewis and Clark (on-going)
<br /> BS, Meteorology, University of Hawaii at Manoa, 2023
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Naalehu Wastewater Treatment Facility PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kau, Hawaii, HI EA/EID-Active --
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The County of Hawaii is considering a range of alternatives to facility the closure of the large capacity cesspools in Pahala and
<br /> Naalehu and has determined to implement a "Package Plant Solution." Rachel is preparing an Environmental Assessment
<br /> pursuant to Chapter 343, HRS and an Environmental Information Document in compliance with SWDA-UIC-AOC-09-2017-0002.
<br /> She also consulted with various government agencies.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> New Aloha Stadium Entertainment District(NASED) NEPA EA
<br /> Honolulu, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> NEPA-Active --
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> b• The State is proposing NASED district and is seeking to utilize Federal funding, thereby be subject to Environmental Review
<br /> pursuant to the National Environmental Policy Act (NEPA). Rachel is preparing an Environmental Assessment report, pursuant to
<br /> the NEPA analysis, which entails comprehensive research and data gathering of Federal environmental regulations on existing
<br /> infrastructure, historical development, endangered species and critical habitats, water resources, and exiting/prior land use
<br /> entitlements in relation to NASED as well as Navy's anticipate involvement; coordination with various government agencies to
<br /> determine federal permitting requirements' and consultation with various stakeholders.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kapalama-lwilei Electrical Infrastructure Improvements(Design-Build) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Kapalama, Oahu, HI Active --
<br /> c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> HCDA is proposing to plan, design and construct electrical infrastructure improvements in the lwilei-Kapalama area. Rachel is
<br /> assisting with preparation of the Planning Assessment Report which is an existing conditions report that will eventually support the
<br /> environmental review process. In addition, Rachel is creating and preparing figures utilizing ArcGIS for the project area,state land
<br /> use district, city and county zoning, and alternative project routes.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Nanakuli High School Performing Arts Center EA PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Nanakuli, Oahu, HI Active --
<br /> d• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Planner for the preparation and processing of an EA pursuant to Chapter 343, HRS, for a new performing arts center at Nanakuli
<br /> High School.The center will encompass approximately 17,603 SF consisting of flex space, theatre workshop, outdoor
<br /> amphitheater and auditorium.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Central Kakaako Street Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Kakaako, Oahu, HI Active --
<br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> HCDA is proposing to plan, design and construct a series of roadway improvements in Central Kakaako to modernize street and
<br /> pedestrian safety in the region. Improvements will occur along Ilaniwai, Halekauwila, Pohukaina and Kamani Streets. Rachel is
<br /> assisting with the data gathering, review of applicable HCDA Plans and zoning documentation.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 15
<br />
|