Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person. <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Todd Yonamine, P.E. Sr. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 32 3 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Portland, 1992 PE-9212, Civil Engineering, Hawaii, 1997 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hawaii State Hospital Water System Improvements <br /> Kaneohe, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Original design -2024 <br /> a. -- <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager overseeing the analysis of the existing water supply system and preparing construction plans for water system <br /> improvements. Improvements include a storage tank, new waterlines and booster pumps. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waikapu Town Center Water System Phase 1 <br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active (In Permitting) -- <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ®Check if project performed with current firm <br /> Project Manager for the design for installation of a private water system to meet DOH and County of Maui DPW requirements. <br /> Project includes two existing potable wells and one irrigation well outfitted with new pumps and motors; 1.2 MG storage reservoir, <br /> pressure-reducing valve stations, electrical equipment building, control building with electrical, mechanical and SCADA <br /> equipment. Estimated construction cost: $12 M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hala'ula Well Development Phase 2 <br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2019 2023 <br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑Check if project performed with current firm <br /> Description: Design for the installation of 700 gpm pump and 200 hp motor, connecting pipeline, 0.5 MG reservoir, control <br /> building, access roadway,site work and appurtenances. Construction cost: $12.8M approx. <br /> Role: Project manager&design engineer <br /> (1)TITLE AND LOCATION(City and State) <br /> Kaupulehu Well No.8 Pump &Connecting Pipeline (2)YEAR COMPLETED <br /> North Kona, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2016 2017 <br /> d. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ❑ Check if project performed with current firm <br /> Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, <br /> access roadway, site work and appurtenances. Construction cost: $2.1M approx. <br /> Role: Project manager&design engineer <br /> (1)TITLE AND LOCATION(City and State) <br /> Ouli Farms Subdivision (2)YEAR COMPLETED <br /> Waimea, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Active (In Permitting) -- <br /> e• (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> The private water system will consist of a 20,000 gallon storage tank, high-lift booster pump station, MCC equipment and DWS <br /> meter connection near the existing DWS 780-ft tank site; and 0.35 MG tank, fire and domestic booster pumps at a new 1,150 ft- <br /> site. These design improvements are done by WOC and team. Our plans will be packaged together with another firm's <br /> subdivision plans, then submitted for permitting. Todd the Sr. Civil Project Manager overseeing the preparation of plans. <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 18 <br />