Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Richard Harada, P.E. Sr. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 41 37 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at Manoa, 1982 PE-6624, Hawaii, Civil Engineering, 1989 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kauai High School Athletic Courts, Parking and Drainage <br /> Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Lihue, Kauai, HI Design—12/2022 Under Construction <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation construction plans for new athletic courts to include tennis courts; reconfiguration of front <br /> parking are to create a safer drop-off and improve traffic circulation; and drainage improvements to include appropriate channeling <br /> for stormwater runoff to minimize flooding from heavy rain events. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hart Street-Waiakamilo Sewer Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Honolulu, Oahu, HI <br /> Design—2020 Under Construction <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Project Manager for the preparation of design and construction plans to replace existing sewer line along Hart Street and <br /> Waiakamilo Street to Dillingham Boulevard. Design includes new 6-inch sewer line along Nimitz Highway, new 8-, 10-and 12- <br /> inch sewer lines along Hart Street which will replace the existing 24-inch sewer line; and new 24-inch sewer line at the <br /> intersection of Dillingham Boulevard and Waiakamilo Road. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kaneohe-Kailua Wastewater Conveyance &Treatment Facilities <br /> Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Kaneohe and Kailua, Oahu, HI Planning 2013 2018 <br /> Civil—2021 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. Project Manager for the planning and preparation of a Facilities Plan for the area serviced by the Kailua Wastewater Pre-Treatment <br /> Plant. The project included assessing existing conditions, projecting future population and land use demands on wastewater, and <br /> providing projects to address current and future deficiencies. It also included extensive work on a sewer flow analysis model to <br /> evaluate the system hydraulics, particularly the wet weather infiltration and inflow during peak storm events. Managed the design <br /> of construction plan for a 3-mile underground sewer tunnel from Kailua WWTP to Kaneohe Pre-Treatment Facility. Mr. Harada was <br /> also the Project Manager for the design phase of the project. ECC: $175 Million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waimano Ridge Sewer System Repairs, Replacements&Related <br /> Improvements PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Pearl City, HI Design-2024 To Start Soon <br /> d• (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Civil Project Manager for the design and preparation of construction plans for sewer improvements at State Department of <br /> Health's property in Pearl City. Improvements include replacement of existing 6-, 8-, and 12-inch sewer lines and the installation of <br /> new sewer laterals. Estimated construction cost: $2.64 million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 17 <br />