|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Brennan Nacario, P.E. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM
<br /> 13 13
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> M.S., Civil Engineering, Santa Clara University, 2013 PE-17830, Hawaii, Civil Engineering, 2017
<br /> B.S., Civil Engineering, Santa Clara University, 2012
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Halawa View Apartments, Phases 2 &3
<br /> Aiea, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design-2/2023 Under Construction
<br /> a.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Manager for the preparation of construction plans for the development of a 25-story, 302-unit apartment building in
<br /> Halawa. The existing site contains existing multiple apartment buildings. The construction plans included demolition and mass
<br /> grading site, as well as construction plans for the new building (water, sewer, drainage, ingress/egress, grading, etc.)
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Malama Honua Public Charter School Improvements
<br /> Waimanalo, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design—2024 --
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Malama Honua Public Charter School is proposing to expand their facilities. Brennan is the Project Manager overseeing the
<br /> preparation of a preliminary engineering report and construction plans for demolition,erosion control,grading, drainage, utilities
<br /> and site layout including driveways,sidewalks, curbs, pedestrian ramps, stairs and planters.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Ulana,Ward Village
<br /> Kakaako, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design -2023 Under Construction
<br /> C. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Project Manager for the development of civil design and construction documents for Ulana, a residential tower located at
<br /> Auahi Street, Kamani Street and Pohukaina Street.The tower will consist of approximately 650 units and commercial space on
<br /> the ground floor. Scope includes preparing construction plans site water,sewer, sidewalks, curb/gutter, drainage, and erosion
<br /> control.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kalia Luau Waikiki
<br /> Waikiki, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active --
<br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Project Civil Engineer to prepare construction plans for a new open-air entertainment center venue on the site formerly known as
<br /> Kyo-Ya Restaurant. The project will consist of a large lawn area for guest seating, a stage with dressing rooms, a two-story multi-
<br /> purpose building with a lanai, additional space for restrooms, office/administration, bar,food preparation/buffet, enclosed seating
<br /> areas, and a tech booth, as well as a pick-up/drop-off, and loading area. The construction plans include demolition and mass
<br /> grading,site utilities (water, sewer, drainage).
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue
<br /> Waikiki, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2023 10/2024
<br /> e. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The former Niketown in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, including
<br /> retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial property. Mr.
<br /> Nacario is the Project Manager for preparation of construction plans, including demolition site layout, grading, and traffic control
<br /> plans. Scope also included preparing sewer connection application and water adequacy request letter.
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 21
<br />
|