Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Tanner Cho, P.E. Civil Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 20 6 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, Purdue University, 2005 PE-14039, Hawaii, Civil Engineering, 2010 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> Erosion and Sediment Control Plan Coordinator, City&County of Honolulu, 12/31/2025 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kapolei Corporation Yard Phase 4 <br /> Kapolei, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Design—2020 Nearly completed (5/2025) <br /> a. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Civil Engineer for the design and preparation of construction plans for new facilities at Kapolei Corporation Yard. Proposed <br /> improvements include site layout, grading, and wet utilities. ECC: $12M <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Honolulu Rapid Transit&Guideway, Phase 3 Airport Section <br /> (Design-Build), Honolulu, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active Under Construction <br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Civil Engineer for the design of the Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section. Phase 3 <br /> consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, <br /> beginning from Aloha Stadium to Middle Street. Scope of work includes civil design of widening of the roadways to accommodate <br /> the new elevated guideway and support columns. Mr. Cho Providing construction support through RFI's, FDC's, and NDC's. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> FY 21 MCON Project P-649 Guam Joint Communications Upgrade <br /> Joint Region Marianas, Naval Base, Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Active Bidding Process <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> C. Sr. Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities <br /> at Naval Base Guam, NCTS Finegayan (Design-Bid-Build). The project consists of construction of a new multi-story Operations <br /> Center to replace Building 112; a new communications equipment storage warehouse; a new underground 288 strand fiber optic <br /> cable from Building 3012 at Naval Base Guam to the future J-755 project site at Andersen Air Force Base southern area <br /> (approximately 23 miles); and demolition of existing facilities as required to allow construction of new communications facility. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> P-760 Training Center(NAVFAC Pacific) <br /> Marine Corps Base Camp Blaz, Guam PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> d Active Bidding Process <br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Sr. Civil Engineer preparing preliminary design for new training center. Preparing preliminary basis of design (water, drainage, <br /> and gravity sanitary sewer) based on programming workshop. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Puunene Roadway Improvements,Wakea Avenue to Kuihelani <br /> Highway (Design-Build) PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Wailuku, HI Active Under Construction <br /> e. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Tanner is the Project Manager overseeing the design and preparation of construction plans for roadway improvements. The <br /> project is intended to reduce traffic congestion, improve traffic flow and improve operations and safety along this roadway. <br /> Improvements include widening roadway from two lanes to four lanes, 5-ft wide shared shoulders,sidewalks, bioswales, and <br /> addition of continuous two-way left turn lane. Estimated construction cost: $25.5 million <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 22 <br />