Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE <br /> Reyn Sugitaya, P.E. Sr. Civil Engineer a.TOTAL b.WITH CURRENT FIRM <br /> 7 7 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> Wilson Okamoto Corporation, Honolulu, Hawaii <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> B.S., Civil Engineering, University of Hawaii at Manoa, 2017 PE-20684, Hawaii, Civil Engineering, 2023 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025 <br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025 <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> FY 21 MCON Project P-649 Guam Joint Communications <br /> Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Joint Region Marianas, Naval Base, Guam Active Bidding Process <br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities. <br /> The project consists of construction of a new multi-story Operations Center to replace Building 112; a new communications <br /> equipment storage warehouse; a new underground 288 strand fiber optic cable from Building 3012 at Naval Base Guam to the <br /> future J-755 project site at Andersen Air Force Base southern area (approximately 23 miles); and demolition of existing facilities <br /> as required to allow construction of new communications facility. <br /> (1)TITLE AND LOCATION(City and State) <br /> (2)YEAR COMPLETED <br /> Lahaina Bypass Phase 1B-2 <br /> Lahaina, Maui, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> 2018 2018 <br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil Engineer assisting with the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) <br /> project. The civil design services include design and layout of the plan and profile of the new highway and preparing site plans, <br /> grading plans, typical sections,erosion control plans, pavement marking and sign plans, cross sections, hydraulic report, and <br /> drainage plans. Design includes a bridge supported by geosynthetic reinforced soil (GRS)abutments. Culvert design <br /> incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kuhio Highway Short-Term Improvements, Kuamoo Road to PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Temporary Bypass Road PROFESSIONAL <br /> 2025 <br /> Wailua-Kapaa, Kauai, HI <br /> C. <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil engineer for the preparation of construction plans for the widening of Kuhio Highway between Temporary Bypass Road and <br /> Kuamoo Road. Improvements include adding an extra southbound lane for 0.64 miles to improve traffic congestion along this <br /> corridor; intersection improvements; and the addition of a turning lane along Kuamoo Road. <br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Auahi Promenade Phases 1 &2,Ward Village CONSTRUCTION(If applicable) <br /> Honolulu, Oahu, HI PROFESSIONAL SERVICES Phase 1 —2024 <br /> Phase 1 Design-2021 Phase 2—under <br /> Phase 2 Design —7/2024 construction <br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm <br /> Civil Engineer preparing plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly 2-lane <br /> road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes constructing near <br /> existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops.A relocated mid-block <br /> crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street.Associated design includes a new <br /> signalized intersection at Ward Ave,grading, curb ramp, landscaping, bike lanes with buffers, pavement marking and signs,water <br /> meter adjustments, and fire hydrant relocations <br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 25 <br />