E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Reyn Sugitaya, P.E. Sr. Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 7 7
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, University of Hawaii at Manoa, 2017 PE-20684, Hawaii, Civil Engineering, 2023
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> FY 21 MCON Project P-649 Guam Joint Communications
<br /> Upgrade PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Joint Region Marianas, Naval Base, Guam Active Bidding Process
<br /> a (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities.
<br /> The project consists of construction of a new multi-story Operations Center to replace Building 112; a new communications
<br /> equipment storage warehouse; a new underground 288 strand fiber optic cable from Building 3012 at Naval Base Guam to the
<br /> future J-755 project site at Andersen Air Force Base southern area (approximately 23 miles); and demolition of existing facilities
<br /> as required to allow construction of new communications facility.
<br /> (1)TITLE AND LOCATION(City and State)
<br /> (2)YEAR COMPLETED
<br /> Lahaina Bypass Phase 1B-2
<br /> Lahaina, Maui, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 2018 2018
<br /> b (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Engineer assisting with the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment)
<br /> project. The civil design services include design and layout of the plan and profile of the new highway and preparing site plans,
<br /> grading plans, typical sections,erosion control plans, pavement marking and sign plans, cross sections, hydraulic report, and
<br /> drainage plans. Design includes a bridge supported by geosynthetic reinforced soil (GRS)abutments. Culvert design
<br /> incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kuhio Highway Short-Term Improvements, Kuamoo Road to PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Temporary Bypass Road PROFESSIONAL
<br /> 2025
<br /> Wailua-Kapaa, Kauai, HI
<br /> C.
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer for the preparation of construction plans for the widening of Kuhio Highway between Temporary Bypass Road and
<br /> Kuamoo Road. Improvements include adding an extra southbound lane for 0.64 miles to improve traffic congestion along this
<br /> corridor; intersection improvements; and the addition of a turning lane along Kuamoo Road.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Auahi Promenade Phases 1 &2,Ward Village CONSTRUCTION(If applicable)
<br /> Honolulu, Oahu, HI PROFESSIONAL SERVICES Phase 1 —2024
<br /> Phase 1 Design-2021 Phase 2—under
<br /> Phase 2 Design —7/2024 construction
<br /> d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Engineer preparing plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly 2-lane
<br /> road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes constructing near
<br /> existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops.A relocated mid-block
<br /> crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street.Associated design includes a new
<br /> signalized intersection at Ward Ave,grading, curb ramp, landscaping, bike lanes with buffers, pavement marking and signs,water
<br /> meter adjustments, and fire hydrant relocations
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 25