|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.TITLE SERVICE PROVIDED 14.YEARS EXPERIENCE
<br /> Chase Kanekuni, P.E. Sr. Civil Engineer a.TOTAL b.WITH CURRENT FIRM
<br /> 7 7
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> Wilson Okamoto Corporation, Honolulu, Hawaii
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> B.S., Civil Engineering, Purdue University, 2018 PE-20724, Hawaii, Civil Engineering, 2024
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Certified Water Pollution Plan Preparer, City&County of Honolulu,12/31/2025
<br /> Certified Erosion and Sediment Control Plan Preparer, City&County of Honolulu, 12/31/2025
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Wahiawa Civic Center
<br /> Wahiawa, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Design— 10/2023 Under Construction
<br /> CA-Active
<br /> a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The new complex will be sited on approximately 4 acres and will consolidate various State and City services, including a civil center,
<br /> judiciary, state office complex, public library and parking. Chase prepared a Preliminary Engineering Report for the Chapter 343,
<br /> HRS EIS. Chase assisted with the preparation of construction drawings for site water, wastewater, demolition, grading, erosion
<br /> control, and egress/ingress. ECC: $76M
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Waikoloa Affordable Housing
<br /> Waikoloa, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active --
<br /> b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> The proposed affordable housing project encompasses approximately 25 acres. The development will consist of 12 residential
<br /> buildings serving 228 residential units. Civil engineer preparing construction plans for site water,wastewater, grading, roadway,
<br /> and drainage.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> University of Hawaii Value Added Product Development Center
<br /> Wahiawa, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> 3/2021 2024
<br /> c. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer assisting with the preparation of construction plans utilities (water, sewer, storm drainage) demolition, grading, site
<br /> layout (parking improvements and sidewalks). The new development consists of a vocational school/educational facility. The
<br /> project site encompasses approximately 1.5 acres. The facility will serve as a multi-purpose facility for activities including, but not
<br /> limited to, festivals, farmers markets, tasting events, merchandising for food products from the facility. ECC: $12 million
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> First Hawaiian Bank Lihue Branch
<br /> Lihue, Kauai, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active 4/2025
<br /> d.
<br /> (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil engineer assisted with the preparation of construction plans for a new branch in Hokulei Village. The project consists of a
<br /> new,free standing bank branch and regional headquarters. Construction drawings include site water,wastewater,grading,erosion
<br /> control, and egress/ingress.
<br /> (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Alii Palms Subdivision
<br /> Kailua Kona, HI PROFESSIONAL SERVICES CONSTRUCTION(If applicable)
<br /> Active Under Construction
<br /> e. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm
<br /> Civil Engineer assisting with the preparation of construction plans for the development of a new subdivision in Kailua-Kona. Alii
<br /> Palms Subdivision encompasses approximately 10 acres and will consist of 58 single family units. Civil scope included preparation
<br /> of construction plans for roadways,water,sewer and storm drainage within the subdivision. WOC also prepared and processed a
<br /> grading permit and NPDES permit. ECC: $20 million (excludes construction of homes).
<br /> AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(REV. 7/2021) PAGE 26
<br />
|