E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Lindsay Nakashima,PE, CWPPP, CESCPP, Deputy Civil Engineering A.TOTAL B.WITH CURRENT FIRM
<br /> MBA Manager 23 23
<br /> 15.FIRM NAME AND LOCATION (City and State)
<br /> y(Bowers+Kubota Consulting,Waipahu,HI
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Science Civil Engineering Professional Engineer/Civil-HI [#12569(exp. 4/30/2026)]
<br /> Master of Business Administration
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> Hawaii Council of Engineering Societies,Past Chair Certified Water Pollution Plan Preparer
<br /> American Society of Civil Engineers(ASCE) Certified Erosion& Sediment Control Plan Preparer
<br /> 19. RELEVANT PROJECTS ti
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> County of Maui,Department of Planning PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Coastal Resilience and Erosion Management Plan 2023 N/A
<br /> Maalaea Village,Maui
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> a. ROLE: Project Civil Engineer.
<br /> SCOPE: Conducted a utility study and developed a framework for managed relocation of Maalaea condos and residences on the
<br /> shoreline.The study looked at the existing conditions providing an asset analysis of the water,sewer,drainage,electrical,and
<br /> access.Impacts to those utilities were then studied based on sea level rise and coastal impacts.Using the information collected,
<br /> the study provided questions and considerations for relocation of those utilities for managed retreat.
<br /> PROJECT COST: $300,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> Hilton Hawaiian Village PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Sea Level Rise Assessment Study 2020 N/A
<br /> Oahu,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> b• ROLE: Project Civil Engineer
<br /> SCOPE: Conducted a study on the impacts to the Hilton Hawaiian Village campus'utility infrastructure,vehicular access,and
<br /> pedestrian routes as a result of sea level rise,passive flooding,and shoreline waves. The study included providing proposed
<br /> mitigation measures to protect the coastline, infrastructure,and ensure critical service components are located above projected
<br /> flood elevations. Opinions of probable construction costs were provided with initial steps to address the rising sea levels and
<br /> plan for the future.PROJECT COST: $93,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> State of Hawaii,Department of Transportation,Highways Kaumualli PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Highway Feasibility Study,Hanapepe to Kekaha Ongoing N/A
<br /> Kauai,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Deputy Project Manager
<br /> c. SCOPE: Conducting a Feasibility Study to explore conceptual details,constraints,and prospective timelines for different
<br /> resiliency improvement alternatives based on probable future scenarios of concern for Route 50, Kaumuali`i Highway,from
<br /> Hanapepe to Kekaha.The objectives of the Feasibility Study are to explore resiliency realities,criticalities,and challenges for
<br /> the Route 50 study area. The scope of work will include coastal modeling of tidal flood frequency analysis and high-resolution
<br /> sea level rise and wave inundation modeling.The modeling will be conducted for a variety of future sea level rise scenarios
<br /> combined with different wave events to help estimate the frequency of occurrence of flooding at selected intervals in the future.
<br /> PROJECT COST: N/A
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City&County of Honolulu,Board of Water Supply PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> HFD NPDES Small MS4 Permit Kaneohe and Kailua Fire Stations 2021 2021
<br /> Kaneohe and Kailua,HI
<br /> d. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE:Project Manager
<br /> SCOPE:Prepared construction documents for storm water management improvements at two City fire stations in Windward Oahu.
<br /> Improvements proposed at both fire stations addressed storm water quality and included redirecting roof and pavement runoff to new
<br /> underground infiltration basins and seepage wells within the station site. PROJECT COST:Kaneohe$350,000/Kailua$450,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Facility Maintenance PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> NPDES MS4 Retrofit Structural BMP Improvements Program—South Street
<br /> Permeable Pavement 2020 N/A
<br /> Honolulu,HI
<br /> e. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Civil Engineer
<br /> SCOPE:Design of four different types of permeable pavement within the bike lane on South Street between Pohukaina Street and
<br /> Kapiolani Boulevard.Pavement types will include a porous asphalt,pervious concrete,and two types of permeable pavers.A sign
<br /> will also be installed to provide information about the pavement types installed and how they are part of a low impact development
<br /> design.PROJECT COST: $2,000,000
<br /> STANDARD FORM 330(7/2o2i)Page 16