Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Eric Tamashiro,PE,ESCPC, Senior Project Manager A.TOTAL B.WITH CURRENT FIRM <br /> CWPPP, CESCPP,LEED AP 31 22 <br /> 15.FIRM NAME AND LOCATION (City and State) <br /> v=Bowers+Kubota Consulting,Waipahu,HI <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Bachelor of Science,Civil Engineering Professional Engineer/Civil-HI [#9787(exp.4/30/2026)] <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> LEED Accredited Professional American Society of Civil Engineers Water Environment Federation <br /> Hawaii Water Environment Association Certified Water Pollution Plan Preparer <br /> Certified Erosion& Sediment Control Plan Preparer Erosion& Sediment Control Plan Coordinator <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Hawaii,Department of Public Works PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Ane Keohokalole Highway 2012 2012 <br /> Kailua-Kona,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> a. ROLE: Civil Engineer <br /> SCOPE: Completed construction documents for the County highway paralleling Queen Kaahumanu Highway for about 2.9 <br /> miles from Palani Road to Hina Lani Street.Also completed an Environmental Assessment;processed U.S.DOT Act of 1966 <br /> Section 4(f) review; conducted the NHPA Section 106 consultation and prepared the preliminary engineering report. <br /> PROJECT COST: $35,000,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> Walton Street Capital LLC/Avalon Development Company LLC PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Kapolei Business Park Phase 2 2017 2017 <br /> Kapolei,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> b. ROLE: Project Manager/Project Engineer <br /> SCOPE:Lead designer for subdivision improvements,including storm drainage system with water quality treatment units, <br /> roadways,water system improvements,and grading. Coordinated plan approval and National Pollutant Discharge Elimination <br /> System (NPDES) permit coverage processing. <br /> PROJECT COST: $22,000,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> City&County of Honolulu,Department of Facility Maintenance Ongoing <br /> Honolulu Fire Department,NPDES Small Municipal Separate Storm Sewer VMF-2017/SE VMF-2017/SE Roof— <br /> System (MS4) Program Assessments Roof—2019/NE 2019/NE Roof&Wash <br /> Oahu,HI Roof&Wash Facility Facility—2022 <br /> c. —2022 <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Civil Engineer <br /> SCOPE: Conducted field evaluations and facility assessments for the Akahi,Waialua,Wahiawa,Kailua,Kaneohe,Kaaawa, <br /> Sunset Beach,and Pawaa HFD stations relative to compliance with the City's NPDES Program.Prepared concept designs, <br /> opinions of cost and engineering reports to address storm water quality improvements. <br /> PROJECT COST: $6,500,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> NAVFAC Hawaii PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> FY21 Special Project RM 17-1635 Red Hill Repair Roads and Erosion <br /> Control 2021 Ongoing <br /> Honolulu,HI <br /> d. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Project Manager <br /> SCOPE: Provided engineering services for the repair of eroded areas, implementation of erosion control and rockfall mitigation <br /> measures,storm drainage improvements,and roadway improvement. Scope of work included conducting site engineering <br /> investigations and preparing 35%,60%,pre-final and final design-bid-build contract documents. <br /> PROJECT COST: $34,985,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> American Savings Bank PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> American Savings Bank Campus 2019 2019 <br /> Honolulu,HI <br /> e (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Senior Project Manager. <br /> SCOPE: Conducted site assessments,supported traffic and archaeological assessments and coordinated the site design for a 9-story, <br /> 120,000 gross square feet office building at the corner of Beretania and Aala Streets. Work within the right-of-way included the <br /> reconstruction of driveway aprons and walkways and utility structure and connections. <br /> PROJECT COST: $34,985,000 <br /> STANDARD FORM 330(7/2o2i)Page 17 <br />