Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE <br /> Hae-Dong Lee,AIA,NCIDQ,LEED AP Principal Architect/Project Manager A.TOTAL B.WITH CURRENT FIRM <br /> MBA19 10 <br /> 15.FIRM NAME AND LOCATION (City and State) <br /> v(Bowers+Kubota Consulting,Waipahu, HI <br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) <br /> Bachelor of Architecture,Architecture HI,Registered Architect [#17013 (exp. 4/30/2026)] <br /> Master of Business Administration GA, Registered Architect <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Institute of Architects,Honolulu Chapter,Member U.S. Green Building Council,LEED AP <br /> 19. RELEVANT PROJECTS <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Hans L'Orange Neighborhood Park-Parking Lot&Comfort Station <br /> Improvements Ongoing TBD <br /> Honolulu,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> a. ROLE: Principal-in-Charge <br /> SCOPE: Architectural and engineering design services for the renovation of existing parking lot and comfort station. Scope of <br /> work includes the reconfiguration and addition to the existing parking lot as well as new comfort station. The new parking lot is <br /> proposed to have the capacity for 122 stalls which is double the current amount presently available.The comfort station will be <br /> constructed to allow/limit access during times at which the baseball field is in operation. <br /> PROJECT COST: $8,600,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Honolulu Zoo Hawaiian Wetland Aviary Ongoing TBD <br /> Honolulu,HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Principal-in-Charge <br /> b. SCOPE: Architecture,landscape architecture,civil and electrical engineering,and entitlement planning services for the initial <br /> phase of a new Hawaii exhibit,which will feature a wetland aviary.The new exhibit starts at the main entrance arrival area <br /> and extends eastward to the Nene Goose Sanctuary. Once completed,the aviary will showcase animals in their habitat ranging <br /> from coastal wetlands to mountainous rain forests and further into dry forests and grasslands.The design intent is to expose <br /> guests to the wide range of native wetland (streams and ponds) and dryland habitats found in Hawaii.The scope of work for this <br /> project covers conceptual design and permitting,with follow-on design development and construction documents. <br /> PROJECT COST: $750,000 <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> City and County of Honolulu, Board of Water Supply PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Secondary Microbiology Lab and Control Center Ongoing TBD <br /> Honolulu, HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> c. <br /> ROLE: Principal-in-Charge <br /> SCOPE: Architectural and engineering design services for the design of a new microbiology testing laboratory for the Board of <br /> Water Supply.The laboratory will contain a virology lab,a testing area with autoclaves and incubators as well as storage and <br /> offices for the lab director and lab techs and will provide desks for field operatives. The lab will be designed to BSL-2. <br /> SIZE: 2,000 square feet/PROJECT COST: $701,122 (fee) <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Maui,Parks &Recreation-Planning and Development, PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> ADA Transition Plan Ongoing HI N/A <br /> d. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Architecture Manager <br /> SCOPE: Review survey of 134 parks,and provide all corrective measures to comply with 2010 ADA standards. Conducting <br /> site verifications of approximately 35%of the sites. Conduct reviews of the study with DCAB and submit final report. <br /> PROJECT COST: $6,000,000 (ROM) <br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED <br /> County of Maui,Maui Police Department PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Maui Police Dispatch Flooring 2017 2018 <br /> Kahului, HI <br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br /> ROLE: Architecture Manager <br /> e' SCOPE: A/E design and construction administration services for modifying the existing dispatch office to create one level floor <br /> eliminating tripping hazards and to bring the dispatch office up to ADA compliance. The existing dispatch consoles and the <br /> access floors are removed and replaced with new consoles and access floors. In addition to the electrical work to accommodate <br /> the new dispatch consoles,the existing clean agent fire suppression system and air handling unit serving the under space of the <br /> access floor are disconnected and reinstalled to allow the installation of the new access floor. <br /> PROJECT COST: $600,000 <br /> STANDARD FORM 330(7/2o21)Page 18 <br />