E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN SERVICE CATEGORY 14.YEARS EXPERIENCE
<br /> Hae-Dong Lee,AIA,NCIDQ,LEED AP Principal Architect/Project Manager A.TOTAL B.WITH CURRENT FIRM
<br /> MBA19 10
<br /> 15.FIRM NAME AND LOCATION (City and State)
<br /> v(Bowers+Kubota Consulting,Waipahu, HI
<br /> 16.EDUCATION(DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE)
<br /> Bachelor of Architecture,Architecture HI,Registered Architect [#17013 (exp. 4/30/2026)]
<br /> Master of Business Administration GA, Registered Architect
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> American Institute of Architects,Honolulu Chapter,Member U.S. Green Building Council,LEED AP
<br /> 19. RELEVANT PROJECTS
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Hans L'Orange Neighborhood Park-Parking Lot&Comfort Station
<br /> Improvements Ongoing TBD
<br /> Honolulu,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE ❑x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> a. ROLE: Principal-in-Charge
<br /> SCOPE: Architectural and engineering design services for the renovation of existing parking lot and comfort station. Scope of
<br /> work includes the reconfiguration and addition to the existing parking lot as well as new comfort station. The new parking lot is
<br /> proposed to have the capacity for 122 stalls which is double the current amount presently available.The comfort station will be
<br /> constructed to allow/limit access during times at which the baseball field is in operation.
<br /> PROJECT COST: $8,600,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu,Department of Design and Construction PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Honolulu Zoo Hawaiian Wetland Aviary Ongoing TBD
<br /> Honolulu,HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Principal-in-Charge
<br /> b. SCOPE: Architecture,landscape architecture,civil and electrical engineering,and entitlement planning services for the initial
<br /> phase of a new Hawaii exhibit,which will feature a wetland aviary.The new exhibit starts at the main entrance arrival area
<br /> and extends eastward to the Nene Goose Sanctuary. Once completed,the aviary will showcase animals in their habitat ranging
<br /> from coastal wetlands to mountainous rain forests and further into dry forests and grasslands.The design intent is to expose
<br /> guests to the wide range of native wetland (streams and ponds) and dryland habitats found in Hawaii.The scope of work for this
<br /> project covers conceptual design and permitting,with follow-on design development and construction documents.
<br /> PROJECT COST: $750,000
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> City and County of Honolulu, Board of Water Supply PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Secondary Microbiology Lab and Control Center Ongoing TBD
<br /> Honolulu, HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> c.
<br /> ROLE: Principal-in-Charge
<br /> SCOPE: Architectural and engineering design services for the design of a new microbiology testing laboratory for the Board of
<br /> Water Supply.The laboratory will contain a virology lab,a testing area with autoclaves and incubators as well as storage and
<br /> offices for the lab director and lab techs and will provide desks for field operatives. The lab will be designed to BSL-2.
<br /> SIZE: 2,000 square feet/PROJECT COST: $701,122 (fee)
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> County of Maui,Parks &Recreation-Planning and Development, PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> ADA Transition Plan Ongoing HI N/A
<br /> d. (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Architecture Manager
<br /> SCOPE: Review survey of 134 parks,and provide all corrective measures to comply with 2010 ADA standards. Conducting
<br /> site verifications of approximately 35%of the sites. Conduct reviews of the study with DCAB and submit final report.
<br /> PROJECT COST: $6,000,000 (ROM)
<br /> (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
<br /> County of Maui,Maui Police Department PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br /> Maui Police Dispatch Flooring 2017 2018
<br /> Kahului, HI
<br /> (3) BRIEF DESCRIPTION (Brief scope,size,cost,etc.)AND SPECIFIC ROLE 0 CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br /> ROLE: Architecture Manager
<br /> e' SCOPE: A/E design and construction administration services for modifying the existing dispatch office to create one level floor
<br /> eliminating tripping hazards and to bring the dispatch office up to ADA compliance. The existing dispatch consoles and the
<br /> access floors are removed and replaced with new consoles and access floors. In addition to the electrical work to accommodate
<br /> the new dispatch consoles,the existing clean agent fire suppression system and air handling unit serving the under space of the
<br /> access floor are disconnected and reinstalled to allow the installation of the new access floor.
<br /> PROJECT COST: $600,000
<br /> STANDARD FORM 330(7/2o21)Page 18