Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency,or 10 projects,if not specified. 4 <br /> Complete one Section F for each project.) <br /> 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED <br /> County of Maui,Department of Public Works PROFESSIONAL SERVICES CONSTRUCTION(fapplcab/e) <br /> Waiale Road Extension Project <br /> Ongoing N/A <br /> Waikapu,HI <br /> 23.PROJECT OWNER'S INFORMATION <br /> a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER <br /> County of Maui,Department of Public Nolly Yagin (808)270-7437 <br /> Works <br /> 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Areas this Project Addresses: <br /> • Chapter 343 HRS/NEPA Environmental Assessment <br /> • Conceptual and Preliminary Engineering <br /> • Agency Coordination and Public Outreach FilrizsE GRApiTs <br /> • Utility Design and Coordination <br /> • Plans, Specifications,and Estimate <br /> • Right-of-Way mapping and appraisal services Rebuilding American Infr stru turf <br /> • Funding(Federal,State,and Public Private Partnerships) with S Ijnta i nahi Iit y and Equity <br /> • RAISE Grants with FHWA/HDOT Oversight <br /> • Construction Management <br /> • Project Management <br /> SCOPE: The Bowers + Kubota project team is providing the County of Maui cradle to grave services, from planning through <br /> construction,on the Waiale Road Extension project.The project will extend Waiale Road from its current terminus at East Waiko Road <br /> southward to Honoapiilani Highway. The proposed extension will support all transportation modes,protect non-motorized travelers, <br /> and is approximately 8,600 lineal feet(ft.)in length within an 80-ft. right-of-way. The Waiale Road extension is a critical part of the <br /> planned regional infrastructure for the County of Maui and will serve as the catalyst for surrounding planned developments to increase <br /> much needed affordable housing. <br /> The B+K project team will review the environmental documentation,preliminary design, and final construction documents for the <br /> Waiale Road extension. <br /> The roadway improvements will include a single span bridge over Waikapu Stream, roundabout intersections, two through lanes, <br /> shoulder bikeways,pedestrian sidewalks,a shared-use path,and parallel grassy swales,which will serve as a permanent stormwater <br /> best management practice(BMP). <br /> The B+K project team will conduct agency and public coordination, both to seek input and provide information relating to the <br /> environmental and design related tasks. The environmental documentation for the improvement project will be prepared as a joint <br /> NEPA/HRS 343 environmental assessment. <br /> Ready to Advertise documents will include construction plans, specifications, engineer's estimate, and permits. Bid support and <br /> construction management will be provided by B+K. <br /> B+K is also assisting the County of Maui by exploring funding options for the roadway project. The funding options include federal- <br /> aid funding,developer pro rata fair share, state funding,federal discretionary grants,and public private partnerships. The B+K team <br /> has already been successful in helping the County obtain a FY2022 RAISE grant for$25 Million. <br /> PROJECT COST: $87,000,000(estimated) <br /> .,1 <br /> aaSi.gas r.ar r.�wre o zc:'r. <br /> ..:;:Eris" I <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. no(Bowers+Kubota Consulting,Inc. Waipahu,HI Project and Construction Management <br /> STANDARD FORM 330(7/2021)Page 23 <br />