My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Systems Investment Plan, Lihue, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC is developing a geographic information system (GIS)and hydraulic model for the County <br /> of Kauai, Dept.of Water(KDOW)as part of the Water Systems Investment Plan (WSIP) project.The WSIP is a <br /> comprehensive master plan, identifying infrastructure and facility improvements in alignment with KDOW's long- <br /> range goals and objectives. BC is working with KDOW to develop a capital improvement program to address system <br /> improvements needed for water supply infrastructure and enterprise systems and prioritize projects to meet level <br /> of service objectives. Included in the project is a financial analysis including utility rates, development charges, and <br /> funding opportunities through local,State and Federal programs.A climate change impact assessment for sea level <br /> rise and storm surge is being conducted along with a desktop condition and resiliency assessment.Stakeholder <br /> engagement is planned throughout the project, including a Ka Pa'akai analyses to collect information on traditional <br /> and customary practices within the study area. <br /> Total Contract Amount: $2M Client:County of Kauai, Dept.of Water <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Systems Investment Plan, Lihue, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC is developing a geographic information system (GIS)and hydraulic model for the County <br /> of Kauai, Dept.of Water(KDOW)as part of the Water Systems Investment Plan (WSIP) project.The WSIP is a <br /> comprehensive master plan, identifying infrastructure and facility improvements in alignment with KDOW's long- <br /> range goals and objectives. BC is working with KDOW to develop a capital improvement program to address system <br /> improvements needed for water supply infrastructure and enterprise systems and prioritize projects to meet level <br /> of service objectives. Included in the project is a financial analysis including utility rates, development charges, and <br /> funding opportunities through local,State and Federal programs.A climate change impact assessment for sea level <br /> rise and storm surge is being conducted along with a desktop condition and resiliency assessment.Stakeholder <br /> engagement is planned throughout the project, including two Ka Pa'akai analyses to collect information on traditional <br /> and customary practices within the study area. <br /> Total Contract Amount: $2M Client:County of Kauai, Dept.of Water <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Risk and Resiliency Assessment and Emergency Response Update, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Hilo, Hawaii 2022 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Oversight. BC performed a risk and resiliency assessment that included an evaluation of County of Hawaii, <br /> Department of Water Supply(HDWS)seven largest systems that met the threshold for America's Water Infrastructure <br /> Act 2018 compliance requirements. BC developed a custom vulnerability assessment tool that evaluated HDWS's <br /> critical assets against the selected natural hazards and malevolent acts.The tool produced a prioritized risk score <br /> for each asset based on the identified threat and the results will be used to support HDWS's future improvement <br /> planning. BC also updated HDWS's Emergency Response Plan which included updates to the Action Plans to prepare <br /> for, respond to,and recover from an emergency event. <br /> Total Contract Amount: $535K Client:County of Hawaii, Dept.of Water Supply <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.