Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Lauren Armstrong,AICP Project Manager a.TOTAL b.WITH CURRENT FIRM <br /> 16 2 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell, Kamuela, Hawaii <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> Master of Urban and Regional Planning, 2012 N/A <br /> BA, Environmental Studies and Anthropology, 2007 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> American Institute of Certified Planners(AICP) <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> DPW Baseyard Facilities Master Plan, Maui, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC was contracted by the County of Maui to complete a Master Plan for Department of Public <br /> Works(DPW) Highways Division Baseyard Facilities.The Master Plan identifies long-term solutions that enable <br /> DPW Highways Division to maintain safe roads, bridges, and drainage facilities. This project includes five key <br /> tasks: 1) Baseyard Facilities Needs Assessment, 2) Facilities Location Alternatives,3) Preferred Alternative and <br /> Implementation,4) Baseyards Master Plan and 5) Moloka`i Cemetery Plan.Stakeholder input throughout the process <br /> is guided by a stakeholder engagement plan that outlines goals,strategies,and key messaging.The scope of services <br /> for this project includes strategic assessment and planning to support infrastructure and operational improvements <br /> for DPW Highways Division baseyards.The Baseyards Master Plan identifies and prioritizes actions that support <br /> County and State initiatives,and best serve the residents,visitors,and other departments in Maui County.To address <br /> sea level rise vulnerability and capacity issues,the Molokai Cemetery Plan task evaluates potential expansion <br /> alternatives and gathers stakeholder input to determine a preferred site. <br /> Total Contract Amount: $808K Client:County of Maui, Dept. of Public Works, Highways Division <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Feasibility Study for East Maui Source Development, Maui PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Island, Hawaii 2025 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Deputy Project Manager. BC provided the County of Maui with a feasibility study to assess existing capacity, refine <br /> future demand projections and evaluate viable water source alternatives that to help assure reliable potable water <br /> supply to address existing limitations and accommodate planned growth on the Central and Upcountry water systems. <br /> Also included is a stream restoration framework which will outline a long-range plan to analyze and address water <br /> availability in select waterways in the Haiku region diverted for irrigation by historic sugarcane operations.Stakeholder <br /> engagement occurred throughout the project. <br /> Total Contract Amount: $1.2M Client: County of Maui, Dept.of Water Supply,Water Resources and Planning Division <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 7 <br />