My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEARCOMPLETED <br /> Hoaloha Park Adaptation Plan, Kahului, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> 2025 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Planning and Stakeholder Engagement. BC supported SSFM International in developingthe Hoaloha Park <br /> Adaptation Plan.The plan included a site and infrastructure vulnerability assessment, user impact evaluation, <br /> and adaptation planning specific to Hoaloha Park, an urban beach park located at Kahului Harbor, Maui.The <br /> plan employed an adaptive pathways approach driven by site-specific and infrastructure-specific vulnerabilities, <br /> considering park users. BC's scope involved preparing technical memorandums to document opportunities and <br /> constraints for future use by assessing existing site conditions and infrastructure against future climate-related <br /> hazards such as sea-level rise, hurricanes, and wildfires.Additionally,the plan analyzed the effects of increased <br /> future use of the park by residents and nearby employees due to planned redevelopment projects in the vicinity.The <br /> team recommended adaptation strategies, including improving sand dunes and relocating infrastructure likely to be <br /> affected by sea level rise. <br /> Total Contract Amount: $60K Client:County of Maui, Dept. of Parks and Recreation <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Koolaupoko Climate Resilience and Adaptation Project, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Kaneohe, Hawaii Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Planning and Stakeholder Engagement. BC is providing engineering services to support the University of Hawaii to <br /> conduct a Military Installation Resilience Review focused on the Koolaupoko district, located on Oahu's southeastern <br /> shore.The project overall objective is to identify climate related threats and hazards to the community surrounding <br /> Kaneohe military base and to present recommendations that enhance resilience and adaption capacity of vulnerable <br /> resources within the project study area. Hawaii's unique geographic location makes the islands particularly <br /> susceptible to a myriad of climate change impacts. Sea level rise and attendant local erosion and flooding, extreme <br /> heat, altered precipitation patterns, and growing wildfire are evident and will become more prevalent in the future, <br /> placing an undue burden on coastal communities and resources across the State. In order to avoid widespread <br /> environmental catastrophe, development needs to prioritize sustainability and increasing climate resilience.The <br /> study will culminate with the three regional implementation strategies identified, mapped, which will be considered <br /> "pilot projects." Each pilot project will recommend mitigation measures to better inform efforts and benefit <br /> surrounding communities. <br /> Total Contract Amount: $235K Client: Research Corporation of the University of Hawaii <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Systems Investment Plan, Lihue, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Strategic Planning. BC is developing a geographic information system (GIS)and hydraulic model for the County <br /> of Kauai, Dept.of Water(KDOW)as part of the Water Systems Investment Plan (WSIP) project.The WSIP is a <br /> comprehensive master plan, identifying infrastructure and facility improvements in alignment with KDOW's long- <br /> range goals and objectives. BC is working with KDOW to develop a capital improvement program to address system <br /> improvements needed for water supply infrastructure and enterprise systems and prioritize projects to meet level <br /> of service objectives. Included in the project is a financial analysis including utility rates, development charges, and <br /> funding opportunities through local,State and Federal programs.A climate change impact assessment for sea level <br /> rise and storm surge is being conducted along with a desktop condition and resiliency assessment.Stakeholder <br /> engagement is planned throughout the project, including a Ka Pa'akai analyses to collect information on traditional <br /> and customary practices within the study area. <br /> Total Contract Amount: $2M Client:County of Kauai, Dept.of Water <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.