Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jaren Hiller,PE*,LEED AP f=k,icily313 a.TOTAL b.WITH CURRENT FIRM <br /> Specialist 29 5 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell, Milwaukee,Wisconsin <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS, Environmental Engineering, 1996 *Wisconsin/Licensed Engineer#33417 <br /> BS,Civil Engineering, 1994 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Leadership in Energy and Environmental Design,Accredited Professional (LEED-AP) #0000021877 <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> South Kohala Flood Study,Waikoloa and Puako, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Hydrologic/Hydraulic Modeling Lead.The South Kohala District on Hawaii Island faces significant flood risks due <br /> to intense rainfall events and urban development,which are overwhelming the area's stormwater infrastructure and <br /> low-lying coastal areas,and ultimately negatively impacting public and private property. BC is collaborating with COH <br /> DPW to create a comprehensive strategy to manage runoff and mitigate flooding in the region.This study aims to <br /> provide a thorough understanding of these risks and propose practical solutions to safeguard the area from future <br /> flood events. <br /> Total Contract Amount: $615K Client:County of Hawaii, Dept.of Public Works <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Program Management for Bull Run Water Treatment Plant, PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Portland,Oregon Ongoing Forthcoming <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Hydrologic/Hydraulic Modeling Lead. BC is developing a smart utility approach that will enable Portland Water <br /> Bureau to operate its new filtration facility in an effective and efficient manner by interconnecting operational and <br /> informational technology systems to promote operational wisdom in support of Portland Water Bureau's business <br /> objectives. BC will also perform a review of existing business and operational systems and processes to provide an <br /> understanding of the current state of Portland Water Bureau's system and architecture including asset management <br /> systems,operational systems including supervisory control and data acquisition,geographic information systems, and <br /> enterprise reporting and analytical systems. <br /> Total Contract Amount: $63M Client: Portland Water Bureau <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> North District Wastewater Treatment Plant Site Prep and Stormwater PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Update Plan, Miami, Florida Ongoing Forthcoming <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Hydrologic/Hydraulic Modeling Lead.The hydrologic and hydraulic modeling is being completed using the <br /> Interconnected Channel and Pond Routing model to assess and size the storm drains,storm force mains,storm pump <br /> stations,and retention pond associated with the expansion and to improve the drainage system at the existing site. <br /> Jaren is leading the civil/site design for the 15-acre high level disinfection plant expansion and executed portions of <br /> the design. <br /> Total Contract Amount: $2.2M Client: Miami-Dade Water and Sewer Dept. <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 17 <br />