Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Waikoloa K-Plant Effluent Disposal,Waikoloa, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Senior Modeler. BC is tasked with evaluating feasible disposal methods for both current disposal and future disposal <br /> demands that meet wastewater and land use regulations, but also the unique soil and topography conditions of the <br /> site. Methods to be evaluated include soil aquifer treatment(SAT), expansion of the existing leachfields, and reuse. <br /> Activities will include soil investigation and percolation testing to determine the appropriate design hydraulic loading <br /> rate for the soil conditions. Upon completion of the feasibility evaluation, BC will design the preferred effluent disposal <br /> option that will include improvements such as pump station, piping,and earthwork.Additional services to support the <br /> project include Archeological Inventory Study and Unexploded Ordinances field work safety support. <br /> Total Contract Amount: $1M Client: Hawaii Water Service Company <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Hare Snipe Creek Watershed Study, Raleigh, North Carolina PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> 2023 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> QA/QC Reviewer. BC provided integrated flooding mitigation and water quality planning,while establishing standards <br /> for conducting future watershed studies within the City.The study was guided by the Equity Framework,which <br /> established City staff goals and priorities to integrate more equitable practices into watershed study development. BC <br /> piloted stream assessment technologies to evaluate results and provide a recommendation for the remaining stream <br /> assessments. BC developed a PCSWMM model to identify areas of flooding and developed a spatial water quality <br /> model, WIP Tools,to calculation nutrient and sediment loadings. BC identified over 60 project concepts that were <br /> evaluated to reduce flooding and/or provide water quality benefits. BC also developed a methodology document to <br /> guide consistent future watershed studies. <br /> Total Contract Amount: $1M Client:City of Raleigh, Engineering Services Dept. <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 18 <br />