My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Recycled Water Program, Boise, Idaho PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Feasibility Study Lead.The City of Boise's Recycled Water Program—the result of a multi-year planning effort led <br /> by BC—is the first municipal implementation of large-scale groundwater recharge in Idaho.This program includes <br /> planning, permitting, pilot testing, and designing infrastructure to treat industrial wastewater and put it to beneficial <br /> use throughout the community.This major program is a central element of the City's strategy to meet water supply <br /> demands amidst rapid growth and to address climate change impacts.As program manager, BC is delivering all <br /> aspects of the project, including overseeing the development a long-term financial plan, providing technical analysis <br /> of potential investment options,supporting stakeholder engagement, and leading the City's regulatory team,which <br /> focuses on regulatory and permit negotiations. <br /> Total Contract Amount: $24M Client:City of Boise <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Chino Basin Program Preliminary Design Report,Chino,California PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Planning Lead.The Chino Basin Program is an innovative water supply project that combines local infrastructure <br /> needs and salinity management with groundwater replenishment,water supply resiliency and ecosystem benefits in <br /> California.One of the Program's objectives includes utilizing advanced treated recycled water for aquifer recharge of <br /> up to 15,000 AFY using injection wells and future supply through extraction wells at up to 50,000 AFY with no more <br /> than 375,000 AF over 25 years.To support this objective and siting, BC developed a comprehensive geochemical <br /> investigation work plan for the investigation of the study area which will be used in siting of the injection and <br /> extraction wellfields and to ensure operational processes are optimal through injection,transfer, and extraction in <br /> the groundwater basin. Brandon reviewed preliminary design report for wells prepared by others and assisted in the <br /> preparation of the comprehensive geochemical characterization work plan which is now in execution. <br /> Total Contract Amount: $11.4M Client: Inland Empire Utilities Agency <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> On-Call Grant Support,Costa Mesa,California PROFESSIONAL SERVICES CONSTRUCTION Of applicable) <br /> 2023 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Manager. BC reviewed state and federal funding opportunities,coordinated with state and federal funding <br /> representatives, and prepared funding applications for opportunities like the California Dept. of Water Resources <br /> Urban and Multibenefit Drought Relief Grant Program. BC helped Mesa Water District secure nearly 50 percent of <br /> the capital costs needed for the Local Groundwater Supply Improvement project Planning Study through the 2023 <br /> U.S. Bureau of Reclamation WaterSMART Desalination Planning Grant. BC collected necessary data,developed <br /> the application referencing statewide and local issues,coordinated with California Dept.of Water Resources,and <br /> submitted the application to them. <br /> Total Contract Amount: $100K Client: Mesa Water District <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.