My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Amy Martin Vt.rt s 8it.,1, a.TOTAL b.WITH CURRENT FIRM <br /> Planning Specialist 18 4 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell, Irvine,California <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS,Civil Engineering, 2007 N/A <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> N/A <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> California Urban Water Agencies Program Management,Walnut PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Creek,California Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Staff Engineer.California Urban Water Agencies(CUWA) is a non-profit corporation of 11 major urban water agencies <br /> collectively delivering drinking water to over two-thirds of California's population. BC has been providing program <br /> management support to CUWA since 2011.With direction from the CUWA Board,which is composed of general <br /> managers and other high-level decision makers from the member agencies, BC manages CUWA operations, providing <br /> technical,financial, and administrative support for near-and long-term initiatives and organization sustainability. BC <br /> also works closely with member agencies through committees and work groups to develop technical and policy work <br /> products that provide common understanding and consensus among the urban water community. <br /> Total Contract Amount: $8M Client:California Urban Water Agencies <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Pure Water Southern California Program,Carson,California PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Funding and Regulatory Support.Ajoint venture of BC and another firm were chosen to provide program and <br /> project management support and engineering design services for the Pure Water Southern California Program,one <br /> of the largest water reuse programs in the world.Anticipated for water delivery by 2032,the program will reuse <br /> the largest untapped wastewater source in the region that currently flows to the ocean to increase water resiliency, <br /> enhance water quality,and fuel economic growth.The joint venture team will lead environmental compliance efforts <br /> and the design and construction of advanced purification facilities at the Sanitation District's Joint Water Pollution <br /> Control Plant.The new facilities will incorporate an innovative 3-step procedure to purify water, including membrane <br /> bioreactors, reverse osmosis,and an ultraviolet light/advanced oxidation process. Up to 60 miles of new pipelines <br /> and associated pump stations will be designed and constructed to transport purified water from the plant to the <br /> region's groundwater basins, industrial facilities,and two of Metropolitan's water treatment plants. <br /> Total Contract Amount: $10.3M Client: Metropolitan Water District of Southern California <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.