Laserfiche WebLink
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Adam Klein, PE* System Vulnerability a.TOTAL b.WITH CURRENT FIRM <br /> Specialist 21 21 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell,Seattle,Washington <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> MS, Environmental/Civil Engineering, 2003 *Washington/Licensed Environmental Engineer#43247 <br /> BS,Civil Engineering, 2001 <br /> MD, Doctor of Medicine, 1998 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> N/A <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLEAND LOCATION(City and State) (2)YEAR COMPLETED <br /> Annacis Island Wastewater Treatment Plant Stage V Expansion, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Vancouver, British Columbia,Canada Ongoing Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Process Engineer. BC led the preliminary design,design and is providing construction engineering services for the <br /> $350 million expansion of the Annacis Island Wastewater Treatment Plant from 125 to 170 mgd. New facilities <br /> include expansion of the world's largest trickling filter/solids contact process and odor control upgrades. Odor control <br /> improvements include engineered media biofilters, scrubbers,tank covers, ductwork, and new buildings.The project <br /> also includes the expansion for the influent pumping system and headworks, grit removal and primary sedimentation, <br /> aeration systems,solids contact tanks,trickling filters, and secondary clarifiers. BC developed the preliminary and <br /> detailed design containing significant seismic upgrades and increased the plant's capacity. <br /> Total Contract Amount: $69M Client: Metro Vancouver,Greater Vancouver Regional District <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Central Valley Nutrient Upgrades,Salt Lake City, Utah PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> Ongoing Ongoing <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Process Design. Nutrient removal upgrade of an 80 mgd treatment plant in Salt Lake City, UT. The design converted <br /> an existing trickling filter/activated sludge plant to biological nutrient removal,featuring a modified West Side <br /> treatment configuration.The design includes over 20 MGal of new and reconfigured aeration basin volume, a <br /> primary sludge fermentation system,a struvite recovery system,and an anammox-based treatment system for <br /> dewatering filtrate. <br /> Total Contract Amount: $50M Client:Central Valley Water Reclamation District <br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Budd Inlet Treatment Plant Master Plan,Olympia,Washington PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> 2022 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Process Engineer. Facility planning effort featuring a downtown 30 mgd nitrogen removal facility and a satellite 2 mgd <br /> MBR facility. The effort includes alternative discharge in the form of groundwater recharge and tertiary treatment <br /> to TIN < 1 mg/L and BOD<3 mg/L. Alternatives assessment included plans for thermophilic digestion,centrate <br /> treatment, advanced biosolids treatment,struvite management,and wet weather treatment. <br /> Total Contract Amount: $500K Client: LOTT Clean Water Alliance <br /> IBrown AND Caldwell IISTANDARD FORM 330(REV.7/2021) : 27 <br />