|
County of Hawaii,Planning Dept. Section E
<br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026
<br /> County of Hawaii, Planning Dept.
<br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Adam Klein, PE* System Vulnerability a.TOTAL b.WITH CURRENT FIRM
<br /> Specialist 21 21
<br /> 15.FIRM NAME AND LOCATION(City and State)
<br /> Brown and Caldwell,Seattle,Washington
<br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> MS, Environmental/Civil Engineering, 2003 *Washington/Licensed Environmental Engineer#43247
<br /> BS,Civil Engineering, 2001
<br /> MD, Doctor of Medicine, 1998
<br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.)
<br /> N/A
<br /> 19.RELEVANT PROJECTS
<br /> a. (1)TITLEAND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Annacis Island Wastewater Treatment Plant Stage V Expansion, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable)
<br /> Vancouver, British Columbia,Canada Ongoing Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm
<br /> Process Engineer. BC led the preliminary design,design and is providing construction engineering services for the
<br /> $350 million expansion of the Annacis Island Wastewater Treatment Plant from 125 to 170 mgd. New facilities
<br /> include expansion of the world's largest trickling filter/solids contact process and odor control upgrades. Odor control
<br /> improvements include engineered media biofilters, scrubbers,tank covers, ductwork, and new buildings.The project
<br /> also includes the expansion for the influent pumping system and headworks, grit removal and primary sedimentation,
<br /> aeration systems,solids contact tanks,trickling filters, and secondary clarifiers. BC developed the preliminary and
<br /> detailed design containing significant seismic upgrades and increased the plant's capacity.
<br /> Total Contract Amount: $69M Client: Metro Vancouver,Greater Vancouver Regional District
<br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Central Valley Nutrient Upgrades,Salt Lake City, Utah PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable)
<br /> Ongoing Ongoing
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm
<br /> Process Design. Nutrient removal upgrade of an 80 mgd treatment plant in Salt Lake City, UT. The design converted
<br /> an existing trickling filter/activated sludge plant to biological nutrient removal,featuring a modified West Side
<br /> treatment configuration.The design includes over 20 MGal of new and reconfigured aeration basin volume, a
<br /> primary sludge fermentation system,a struvite recovery system,and an anammox-based treatment system for
<br /> dewatering filtrate.
<br /> Total Contract Amount: $50M Client:Central Valley Water Reclamation District
<br /> c. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Budd Inlet Treatment Plant Master Plan,Olympia,Washington PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable)
<br /> 2022 N/A
<br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm
<br /> Process Engineer. Facility planning effort featuring a downtown 30 mgd nitrogen removal facility and a satellite 2 mgd
<br /> MBR facility. The effort includes alternative discharge in the form of groundwater recharge and tertiary treatment
<br /> to TIN < 1 mg/L and BOD<3 mg/L. Alternatives assessment included plans for thermophilic digestion,centrate
<br /> treatment, advanced biosolids treatment,struvite management,and wet weather treatment.
<br /> Total Contract Amount: $500K Client: LOTT Clean Water Alliance
<br /> IBrown AND Caldwell IISTANDARD FORM 330(REV.7/2021) : 27
<br />
|