My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> d. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Chambers Creek Regional Wastewater Treatment Plant Expansion, PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> University Place,Washington 2021 2017 <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Process Design Lead.With a service population projected to increase by 130%over the next 30 years and <br /> increasingly stringent water quality regulations,the County needed to develop a flexible facilities expansion plan and <br /> process design upgrades for its Chambers Creek Regional WWTP. BC's cost-effective recommended design enabled <br /> the County to increase capacity by 50%, reduce chemical and energy demands,and incorporate a sidestream <br /> treatment process that saved $7M in operating costs. Located on a site integrating a 180-acre utility site into a <br /> 920-acre regional park on the waterfront,construction was coordinated with the 2015 U.S.Open golf championship, <br /> hosted at the Chambers Bay Golf Course.This project pioneered a model for sustainably co-locating community <br /> infrastructure in a recreational area without compromising the utility's ability to provide a high level of service.The <br /> $353M project represents the successful implementation of proprietary,sole-source technology under a GC/CM <br /> contracting procedure. <br /> Total Contract Amount: $65.9M Client: Pierce County, Dept. of Public Utilities <br /> e. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Sea Level Rise Scenario Planning,Olympia,Washington PROFESSIONAL SERVICES CONSTRUCTION(ifapplicable) <br /> 2016 N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Process Engineer.Given the Budd Inlet Treatment Plant's proximity to coastal water bodies and its location <br /> on a peninsula, Budd Inlet Treatment Plant is vulnerable to flooding from extreme weather and sea level rise. <br /> Acknowledging the potential risk, Lacey,Olympia,Tumwater, and Thurston Counties,through the LOTT Clean Water <br /> Alliance, have partnered with Brown and Caldwell to conduct a study that assesses how sea level rise and climate <br /> changes may affect the Plant.The study develops five scenarios as a benchmark for assessing the vulnerability of <br /> Budd Inlet Treatment Plant through the year 2050.The five scenarios consider projections of sea level rise, extreme <br /> tides,tidal waves,and storm surge phenomena, including compounding effects,and their corresponding impacts on <br /> the Plant. <br /> Total Contract Amount: $45K Client: LOTT Clean Water Alliance <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.