My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-27 PL-INT-2025-010858 Brown and Caldwell - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:09:32 AM
Creation date
6/30/2025 9:03:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawaii,Planning Dept. Section E <br /> PL.4)Community Planning(Community/Regional Plans,General Plan,Climate Adaptation) Fiscal Year 2025-2026 <br /> County of Hawaii, Planning Dept. <br /> E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Tom Myers, PE Pnncipai mnarg a.TOTAL b.WITH CURRENT FIRM <br /> 32 32 <br /> 15.FIRM NAME AND LOCATION(City and State) <br /> Brown and Caldwell, Honolulu, Hawaii <br /> 16.EDUCATION(Degree and Specialization) 17.CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS, Environmental Engineering, 1994 Hawaii/Licensed Civil Engineer#9758; Exp 4/30/26 <br /> 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) <br /> Trained in the Sandia Risk Assessment Methodology for Security of Water/Wastewater RAM-WSM;Water Environment <br /> Federation/Hawaii Water Environment Association;American Water Works Association <br /> 19.RELEVANT PROJECTS <br /> a. (1)TITLEAND LOCATION(City and State) (2)YEAR COMPLETED <br /> DPW Baseyard Facilities Master Plan, Maui, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Principal-in-Charge. BC was contracted by the County of Maui to complete a Master Plan for Department of Public <br /> Works(DPW) Highways Division Baseyard Facilities.The Master Plan identifies long-term solutions that enable <br /> DPW Highways Division to maintain safe roads, bridges, and drainage facilities.This project includes five key <br /> tasks: 1) Baseyard Facilities Needs Assessment, 2) Facilities Location Alternatives,3) Preferred Alternative and <br /> Implementation,4) Baseyards Master Plan and 5) Moloka`i Cemetery Plan.Stakeholder input throughout the process <br /> is guided by a stakeholder engagement plan that outlines goals,strategies,and key messaging.The scope of services <br /> for this project includes strategic assessment and planning to support infrastructure and operational improvements <br /> for DPW Highways Division baseyards.The Baseyards Master Plan identifies and prioritizes actions that support <br /> County and State initiatives,and best serve the residents,visitors,and other departments in Maui County.To address <br /> sea level rise vulnerability and capacity issues,the Molokai Cemetery Plan task evaluates potential expansion <br /> alternatives and gathers stakeholder input to determine a preferred site. <br /> Total Contract Amount: $808K Client:County of Maui, Dept. of Public Works, Highways Division <br /> b. (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Water Systems Investment Plan, Lihue, Hawaii PROFESSIONAL SERVICES CONSTRUCTION(if applicable) <br /> Ongoing N/A <br /> (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE❑x Check if project performed with current firm <br /> Project Oversight. BC is developing a geographic information system (GIS)and hydraulic model for the County <br /> of Kauai, Dept.of Water(KDOW)as part of the Water Systems Investment Plan (WSIP) project.The WSIP is a <br /> comprehensive master plan, identifying infrastructure and facility improvements in alignment with KDOW's long- <br /> range goals and objectives. BC is working with KDOW to develop a capital improvement program to address system <br /> improvements needed for water supply infrastructure and enterprise systems and prioritize projects to meet level <br /> of service objectives. Included in the project is a financial analysis including utility rates, development charges, and <br /> funding opportunities through local,State and Federal programs.A climate change impact assessment for sea level <br /> rise and storm surge is being conducted along with a desktop condition and resiliency assessment.Stakeholder <br /> engagement is planned throughout the project, including a Ka Pa'akai analyses to collect information on traditional <br /> and customary practices within the study area. <br /> Total Contract Amount: $2M Client:County of Kauai, Dept.of Water <br /> IBrown AND Caldwell STANDARD FORM 330(REV.7/2021) : 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.