My WebLink
|
Help
|
About
|
Sign Out
Home
2025-06-29 PL-INT-2025-010865 The Limtiaco Consulting Group, Inc. - Category PL.5
PublicDocuments
>
Finance Department
>
Purchasing Division
>
Professional Services Information
>
SOQs- Approved Professional Service Providers
>
FY 25-26
>
PL - PLANNING
>
PL.05 - Environmental- EA, EIS
>
2025-06-29 PL-INT-2025-010865 The Limtiaco Consulting Group, Inc. - Category PL.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2025 9:29:13 AM
Creation date
6/30/2025 9:26:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. <br /> Complete one Section F for each project.) 6 <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> `Aiea 497 Production Well Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> `Aiea, Hawai`i On-going <br /> 23.PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT <br /> Board of Water Supply Mr. Dominic Dias, P.E. TELEPHONE NUMBER <br /> City and County of Honolulu (808) 748-5928 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> Planning Fee-$300,000 <br /> Scope <br /> Preparation of an Environmental Assessment for the installation of a <br /> production well to convey water from the `Aiea 497 system to the <br /> I, 1la i � ��, Honolulu 180 system. <br /> ' ik i� ark; <br /> "" . Relevant Project Elements <br /> • <br /> Ai Feasibility Study and Analysis <br /> r d "p Ai Environmental Assessment <br /> 'Aiea 497 reservoir Ai Public Meetings and Outreach <br /> The BWS proposes to install a production well in the upper'Aiea Environmental Assessment <br /> area,which includes installation of a control building, new pipeline, TLCG is responsible for the preparation of all necessary <br /> influent/effluent main upsizes, control valve assemblies, environmental clearances, including incidental and related <br /> emergency pump connection, and appurtenances to improve technical work associated with the preparation, assimilation, and <br /> operational ability to convey water from the 'Aiea system to the publication of the Draft and Final EA in accordance with HRS <br /> Honolulu 180 system.Project scope consists of the preparation of Chapter 343. The EA will also include applicable information <br /> a Preliminary Engineering Analysis to evaluate the feasibility of specified in the latest guidelines from the Environmental Review <br /> construction the new production well and analyze project Program (ERP) under the State of Hawai'i Office of Planning and <br /> requirements to the extent necessary for evaluation in the Sustainable Development. <br /> Environmental Assessment(EA). <br /> PIM Application <br /> TLCG will prepare a PIM Revision Application for the new <br /> production well in accordance with City and County of Honolulu <br /> PIM requirements, inclusive of consultation with agencies, civic <br /> groups, and individuals. Assistance at public informational <br /> meetings is also required, including a Neighborhood Board <br /> meeting and PIM presentation. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. Cultural Surveys Hawai'i, Inc. Kailua, Hawai'i Archaeology <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. AECOS, Inc. Kane'ohe, Hawai'i Biological Reconnaissance, Water <br /> Quality Investigations <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. <br /> STANDARD FORM 330(REV.8/2016)PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.