Laserfiche WebLink
G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br /> 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F <br /> CONTRACT (Fill in "Example Projects Key"section below before completing <br /> PERSONNEL <br /> (From Setion E, (From Section E, table. Place X"under project key number for <br /> Block 12) Block 13) participation in same or similar role.) <br /> 1 2 3 4 5 6 7 8 9 10 <br /> Ian Arakaki, P.E., CCM Principal-in-Charge X <br /> Jason Lau, P.E. Principal Engineer X X X X <br /> Kyle Kaneshiro, P.E. Principal Engineer X X X X <br /> Jason Nakata, P.E. Environmental Planner X X X X X <br /> 29. EXAMPLE PROJECTS KEY <br /> NUMBER TITLE OF EXAMPLE PROJECT(From Section F) NUMBER TITLE OF EXAMPLE PROJECT(From Section F) <br /> Isaac Kepo'okalani Hale Beach Park Improvements- <br /> 1 FEMA 6 'Aiea 497 Production Well Environmental Assessment <br /> Pohoiki Boat Ramp Dredging of Volcanic Debris and Engineering Services for Waimanalo Residential and <br /> 2 Hazard Mitigation 7 Subsistence Agricultural Lots <br /> New Administration and Baseyard Facility in West Malaekahana State Recreation Area (SRA)—Kahuku <br /> 3 Hawaii for DLNR 8 Section, Park Improvements <br /> 4 Kea'au Zero Waste Facility 9 Maui Office Annex Building <br /> P&E Work for Waiawa 228 Reservoirs Environmental DOT Maui District MS4 Program—Kahului Baseyard <br /> 5 Assessment 10 Improvements <br /> STANDARD FORM 330(REV.7/2021)PAGE 4 <br />