Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT <br /> QUALIFICATIONS FOR THIS CONTRACT KEY NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects,if not specified. <br /> Complete one Section F for each project.) 10 <br /> 21.TITLE AND LOCATION (City and State) 22.YEAR COMPLETED <br /> DOT Maui District MS4 Program — Kahului Baseyard PROFESSIONAL SERVICES CONSTRUCTION(If applicable) <br /> Improvements 2022 On-going <br /> Kahului, Maui <br /> 23.PROJECT OWNER'S INFORMATION <br /> a. PROJECT OWNER b. POINT OF CONTACT NAME c.POINT OF CONTACT <br /> State of Hawaii Mr. Keith Miyashiro TELEPHONE NUMBER <br /> Department of Transportation—Highways Div (808) 483-7290 <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) <br /> 4,w s f(w r <br /> Planning and Design Fee-$255,000 <br /> Construction Cost-$1,900,000 <br /> pppm Scope <br /> w - Civil engineering and environmental planning services to make <br /> various MS4 Program improvements at the DOT Kahului Baseyard. <br /> Relevant Project Elements <br /> Ai Feasibility Study and Analysis Ai Permit Applications <br /> Ai Environmental Assessment Ai Construction Documents <br /> Existing fueling station <br /> TLCG provided civil engineering and environmental planning Assessment(EA)in accordance with HRS Chapter 343 and SMA <br /> services for MS4 Program improvements at the DOT Kahului Permit (SM1), and project coordination with subconsultants, <br /> Baseyard, including replacement of the existing non-operational client, and government agencies. The Final EA was published in <br /> wash rack, installation of photovoltaic systems on all existing 2023. <br /> buildings, and increasing the capacity and operational capability <br /> of the existing fueling station. The selected improvements include electrical upgrades and <br /> replacement of two existing fuel tanks with aboveground fuel <br /> Duties included civil engineering analysis (including site layout, storage tanks. Design services included preparation of <br /> traffic flow, sewer, and drainage) for various concept designs for construction drawings, technical specifications, and opinion of <br /> a wash rack system to wash DOT vehicles (trailers and large probable cost; coordination with design team;and services during <br /> construction equipment) and a PV equipment storage building. bidding and construction. <br /> Environmental planning services for the development of a new <br /> parking lot layout included preparation of an Environmental Project Status:Construction expected to be completed in 2025. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> a. AECOS, Inc. Kane'ohe, Hawai'i Biological Reconnaissance, Water <br /> Quality Investigations <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> b. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> C. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> d. <br /> (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE <br /> e. <br /> STANDARD FORM 330(REV.8/2016)PAGE 3 <br />