Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Ian Arakaki, P.E., CCM Principal-in-Charge a. TOTAL b. WITH CURRENT FIRM <br /> 23 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS/1996/Civil Engineering HAWAII 2001/Civil Engineering (No. 10291) <br /> HAWAII 2013/CMAA Certified Construction Manager <br /> (No.2737) <br /> HAWAII 2025/CCH DPP Erosion and Sediment Control <br /> Plan Coordinator <br /> HAWAII 2025/CCH NPDES MS4 Construction <br /> Inspector Training Certification <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii <br /> American Society of Civil Engineers—Board of Directors, Past President,2009-2015 <br /> American Water Works Association <br /> Construction Management Association of America <br /> Hawaii Water Environment Association <br /> Water Environment Federation <br /> 19.RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Preliminary Engineering Study and Environmental Assessment for PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> `Aina Haina Reservoir No.2 2016 N/A <br /> Honolulu, Hawai`i <br /> a. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Principal-in-Charge for the preparation of a Preliminary Engineering Study(PES)to determine the suitability of the remaining land area within the <br /> Board of Water Supply's'Aina Haina Reservoir No. 1 and Booster Station property to site a second 0.5-million-gallon reservoir. Duties included <br /> preparing the PES, conducting a visual impact evaluation from the affected public viewpoints, identifying permit requirements, preparing cost <br /> estimates and project timelines,overseeing the soils survey and structural analysis,and attending Neighborhood Board meetings. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wastewater Program Management(DDC/WEC Staff Augmentation) PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Honolulu, Hawai`i On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> b. <br /> Principal-in-Charge responsible for providing technical engineering services to assist the City and County of Honolulu, Department of <br /> Environmental Services — Division of Wastewater Engineering and Construction in project management; construction management; and <br /> coordination of planning, design, and construction activities. Responsible for construction management services including conducting jobsite <br /> meetings,reviewing construction submittals,monitoring the work of the contractor,resolving conflicts,and overseeing final testing and inspection. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Project Management Services for Security Projects PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Honolulu, Hawai`i On-going <br /> c. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Principal-in-Charge to assist the BWS in management of the Security Capital Improvement Program(CIP). Responsibilities include evaluation of <br /> existing physical security systems and alternatives, recommendations for optimum physical security systems (fencing, enclosures, building <br /> security),defining and prioritizing physical security CIP projects,development of a physical security CIP plan,and project management services. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Lead Service Line Inventory,Water Quality Study,and Related PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Technical Services On-going <br /> Island-wide, O`ahu, Hawai`i <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> d. <br /> Principal-in-Charge to assist the BWS in their efforts to bring operations in compliance with the revised EPA Lead and Copper Rule. Duties <br /> include program development and management;conducting inter-agency workshops and public outreach activities;preparation of a lead service <br /> line (LSL) inventory to identify and catalog the presence of hazardous materials in the BWS water distribution system; preparation of a list of <br /> sampling sites for each BWS water system to include residential structures, schools, and licensed child care facilities; conducting tap water <br /> sampling analysis;and development of full and partial LSL replacement plans. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kalaeloa Seawater Desalination Facility Design-Build-Operate- PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Maintain On-going <br /> Ewa, O`ahu, Hawai`i <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> e. <br /> Principal-in-Charge to assist the BWS with the development of a Request for Proposal(RFP),selection of the best-valued proposal,and execution <br /> of a Service Agreement with a DBOM contractor qualified to convert a 20-acre property into a seawater desalination facility.Duties include project <br /> coordination; development of a project strategy; assistance in preparing a Design Requirements package that will contain the specifications <br /> required to establish the design, construction, and operational performance standards for the project; and assistance with ranking offers and <br /> evaluation of proposals. <br /> STANDARD FORM 330(REV.7/2021)PAGE 2 <br />