Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE <br /> Jason Lau, P.E. Principal Engineer a. TOTAL b. WITH CURRENT FIRM <br /> 33 26 <br /> 15. FIRM NAME AND LOCATION(City and State) <br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii <br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline) <br /> BS/1992/Civil Engineering HAWAII 1997/Civil Engineering (No.9360) <br /> HAWAII 2023/NASSCO PACP& MACP Certification <br /> HAWAII 2025/CCH DPP Certified Erosion and Sediment <br /> Control Plan Preparer <br /> HAWAII 2025/CCH DPP Certified Water Pollution Plan <br /> Preparer <br /> HAWAII 2025/EnviroCert Certified Professional in Erosion <br /> and Sediment Control <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) <br /> American Council of Engineering Companies of Hawaii <br /> American Public Works Association—Board of Directors, Past President,2009-2014 <br /> Hawai`i Water Environment Association <br /> Water Environment Federation <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> `Aiea 497 Production Well Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> `Aiea, Hawai`i On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> a. Principal Engineer for the preparation of an Environmental Assessment(EA)for the installation of a production well in the upper'Aiea area,which <br /> includes installation of a control building,new pipeline,influent/effluent main upsizes,control valve assemblies,emergency pump connection,and <br /> appurtenances to improve operational ability to convey water from the'Aiea system to the Honolulu 180'system. Duties include preparation of a <br /> Preliminary Engineering Analysis to evaluate the feasibility of the construction of the new well and analyze project requirements to the extent <br /> necessary for evaluation in the EA. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Kea'au Zero Waste Facility PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Kea'au, Hawaii 2018 N/A <br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Principal Engineer responsible for civil design services for the development of a new zero waste facility as part of the Agribusiness Development <br /> Corporation's initiative to expand their sustainable program of converting animal waste to product biofuel. Duties included preparation of <br /> construction documents,drainage report,and Erosion Control Report; project coordination;and services during bidding and construction. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Malaekahana State Recreation Area(SRA)—Kahuku Section, Park PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Improvements 2022 On-going <br /> La`ie, Hawai`i <br /> c. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> Principal Engineer to provide civil planning and design services to assess the condition of seven cabins and related infrastructure improvements <br /> at Malaekahana SRA. Responsible for the preparation of a site development planning report; demolition plans and specifications of existing <br /> cabins and auxiliary facilities; construction documents and construction cost estimates for new cabins, auxiliary facilities, and utilities; project <br /> coordination;and services during bidding and construction. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> DOT Maui District MS4 Program—Kahului Baseyard Improvements PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Kahului, Maui 2023 On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> d. Principal Engineer for civil engineering and environmental planning services for MS4 Program improvements at the DOT Kahului Baseyard, <br /> including replacement of the non-operational wash rack,installation of photovoltaic systems on all existing buildings,and increasing the capacity <br /> and operational capability of the existing fueling station. Duties included civil engineering analysis for various concept designs for a wash rack <br /> system and PV equipment storage building; environmental planning services for the development of a new parking lot layout; preparation of <br /> construction documents;services during bidding and construction;and project coordination with subconsultants,client,and government agencies. <br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED <br /> Wahiawa Reclaimed Water Irrigation System PROFESSIONAL SERVICES CONSTRUCTION(If Applicable) <br /> Wahiawa, Hawai`i On-going <br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm <br /> e. Principal Engineer for the design of a new wastewater reclaimed water irrigation system to deliver recycled water from the Wahiawa WWTP and <br /> raw water from Wahiawa Reservoir to the existing 3MG and 10MG reservoirs and a proposed 14 MG reservoir at Galbraith Farmland. Services <br /> include civil planning and preliminary engineering services for the interconnection of Agribusiness Development Corporation open air reservoirs <br /> at Galbraith Farmland,design of 20-and 24-inch transmission pipelines and grading at proposed valve boxes,and services during bidding and <br /> construction. <br /> STANDARD FORM 330(REV.7/2021)PAGE 2 <br />