E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Jason Lau, P.E. Principal Engineer a. TOTAL b. WITH CURRENT FIRM
<br /> 33 26
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS/1992/Civil Engineering HAWAII 1997/Civil Engineering (No.9360)
<br /> HAWAII 2023/NASSCO PACP& MACP Certification
<br /> HAWAII 2025/CCH DPP Certified Erosion and Sediment
<br /> Control Plan Preparer
<br /> HAWAII 2025/CCH DPP Certified Water Pollution Plan
<br /> Preparer
<br /> HAWAII 2025/EnviroCert Certified Professional in Erosion
<br /> and Sediment Control
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Council of Engineering Companies of Hawaii
<br /> American Public Works Association—Board of Directors, Past President,2009-2014
<br /> Hawai`i Water Environment Association
<br /> Water Environment Federation
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> `Aiea 497 Production Well Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> `Aiea, Hawai`i On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> a. Principal Engineer for the preparation of an Environmental Assessment(EA)for the installation of a production well in the upper'Aiea area,which
<br /> includes installation of a control building,new pipeline,influent/effluent main upsizes,control valve assemblies,emergency pump connection,and
<br /> appurtenances to improve operational ability to convey water from the'Aiea system to the Honolulu 180'system. Duties include preparation of a
<br /> Preliminary Engineering Analysis to evaluate the feasibility of the construction of the new well and analyze project requirements to the extent
<br /> necessary for evaluation in the EA.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kea'au Zero Waste Facility PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Kea'au, Hawaii 2018 N/A
<br /> b. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principal Engineer responsible for civil design services for the development of a new zero waste facility as part of the Agribusiness Development
<br /> Corporation's initiative to expand their sustainable program of converting animal waste to product biofuel. Duties included preparation of
<br /> construction documents,drainage report,and Erosion Control Report; project coordination;and services during bidding and construction.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Malaekahana State Recreation Area(SRA)—Kahuku Section, Park PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Improvements 2022 On-going
<br /> La`ie, Hawai`i
<br /> c. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principal Engineer to provide civil planning and design services to assess the condition of seven cabins and related infrastructure improvements
<br /> at Malaekahana SRA. Responsible for the preparation of a site development planning report; demolition plans and specifications of existing
<br /> cabins and auxiliary facilities; construction documents and construction cost estimates for new cabins, auxiliary facilities, and utilities; project
<br /> coordination;and services during bidding and construction.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> DOT Maui District MS4 Program—Kahului Baseyard Improvements PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Kahului, Maui 2023 On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> d. Principal Engineer for civil engineering and environmental planning services for MS4 Program improvements at the DOT Kahului Baseyard,
<br /> including replacement of the non-operational wash rack,installation of photovoltaic systems on all existing buildings,and increasing the capacity
<br /> and operational capability of the existing fueling station. Duties included civil engineering analysis for various concept designs for a wash rack
<br /> system and PV equipment storage building; environmental planning services for the development of a new parking lot layout; preparation of
<br /> construction documents;services during bidding and construction;and project coordination with subconsultants,client,and government agencies.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Wahiawa Reclaimed Water Irrigation System PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Wahiawa, Hawai`i On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> e. Principal Engineer for the design of a new wastewater reclaimed water irrigation system to deliver recycled water from the Wahiawa WWTP and
<br /> raw water from Wahiawa Reservoir to the existing 3MG and 10MG reservoirs and a proposed 14 MG reservoir at Galbraith Farmland. Services
<br /> include civil planning and preliminary engineering services for the interconnection of Agribusiness Development Corporation open air reservoirs
<br /> at Galbraith Farmland,design of 20-and 24-inch transmission pipelines and grading at proposed valve boxes,and services during bidding and
<br /> construction.