|
.E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Jason Nakata, P.E. Environmental Planner a. TOTAL b. WITH CURRENT FIRM
<br /> 17
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS/2008/Civil Engineering HAWAII 2017/Civil Engineering (No. 17843)
<br /> MBA/2017/Business Administration
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Council of Engineering Companies of Hawaii
<br /> American Planning Association
<br /> American Society of Civil Engineers
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Isaac Kepo`okalani Hale Beach Park Improvements—FEMA PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Puna, Hawai`i Island On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> a. Environmental Planner to provide civil planning and design services to develop a park master plan and construction drawings to expand use
<br /> areas at the existing Isaac Hale Beach Park and enhance existing amenities to increase usability and utility for the community. Improvements
<br /> include on-site water system improvements; comfort station upgrades; on-site pedestrian access enhancements; parking improvements;
<br /> generator building upgrades;cultural preservation enhancements; landscaping improvements;and construction of a new administrative support
<br /> building, pavilions,and canoe building structure. Responsible for the preparation of a site development planning report and obtaining necessary
<br /> permits and environmental clearances.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> P&E Work for Waiawa 228 Reservoirs Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Waipahu, Hawaii 2024 N/A
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> b. Environmental Planner responsible for the preparation of an Environmental Assessment (EA) and Public Infrastructure Map (PIM) for three
<br /> proposed reservoirs(8.5 MGD total capacity),30-inch influent main,30-inch effluent main,access road,and appurtenances in the Waiawa Ridge
<br /> to improve operational ability to convey water from the 228 system to the Honolulu 180 System 42-inch main. Project duties included preparing
<br /> all necessary Environmental Clearances including incidental and related technical work associated with the preparation, assimilation, and
<br /> publication of the Draft and Final EA(2023)in accordance with HRS Chapter 343;preparing a PIM Revision Application,inclusive of consultation
<br /> with agencies,civic groups,and individuals;attendance at public informational meetings;and project management services.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> `Aiea 497 Production Well Environmental Assessment PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> `Aiea, Hawai`i On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> C. Environmental Planner for the preparation of an Environmental Assessment (EA) and Public Infrastructure Map (PIM) for the installation of a
<br /> production well in the upper'Aiea area,which includes installation of a control building, new pipeline, influent/effluent main upsizes,control valve
<br /> assemblies,emergency pump connection,and appurtenances to improve operational ability to convey water from the'Aiea system to the Honolulu
<br /> 180'system.Project duties included preparing all necessary Environmental Clearances including incidental and related technical work associated
<br /> with the preparation, assimilation, and publication of the Draft and Final EA in accordance with HRS Chapter 343; preparing a PIM Revision
<br /> Application, inclusive of consultation with agencies,civic groups,and individuals;and attendance at public informational meetings.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Malaekahana State Recreation Area(SRA)—Kahuku Section, Park PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Improvements 2022 On-going
<br /> La`ie, Hawai`i
<br /> d. (3) BRIEF DESCRIPTIONsco a size,cost,etc.)AND SPECIFIC ROLE
<br /> (Briefscope, [X]Check if project performed with current firm
<br /> Environmental Planner to provide civil planning and design services to assess the condition of seven cabins and related infrastructure
<br /> improvements at Malaekahana SRA. Responsible for obtaining necessary permit applications and exemptions including NPDES, NOI Form C,
<br /> Shoreline Setback Determination Application,and Special Management Area Major Permit.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Statewide Storm Water Management Program—Environmental PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Assessment for Kakoi Base Yard Improvements 2014 N/A
<br /> Honolulu, Hawai`i
<br /> e. (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Environmental Planner responsible for the preparation of an Environmental Assessment(EA), pursuant to HRS Chapter 343, for the proposed
<br /> O'ahu District Office Base Yard Canopy Extension and Maintenance Storage Building project. Project duties encompass all facets of the EA
<br /> process, including agency consultation and public outreach, preparation and publication of the Draft and Final EA, and identifying applicable
<br /> permits required for the project.The Final EA was published in 2014.
<br /> STANDARD FORM 330(REV.7/2021)PAGE 2
<br />
|