|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
<br /> Kyle Kaneshiro, P.E. Principal Engineer a. TOTAL b. WITH CURRENT FIRM
<br /> 30 17
<br /> 15. FIRM NAME AND LOCATION(City and State)
<br /> The Limtiaco Consulting Group, Inc. Honolulu, Hawaii
<br /> 16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION(State and Discipline)
<br /> BS/1995/Civil Engineering HAWAII 2001/Civil Engineering (No. 10268)
<br /> HAWAII 2025/CCH DPP Certified Erosion and
<br /> Sediment Control Plan Preparer
<br /> HAWAII 2025/CCH DPP Certified Water Pollution Plan
<br /> Preparer
<br /> HAWAII 2025/CCH DPP Erosion and Sediment Control
<br /> Plan Coordinator
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.)
<br /> American Council of Engineering Companies of Hawaii—Board of Directors+Past President,2019-2025
<br /> Hawai`i Water Environment Association
<br /> Water Environment Federation
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Isaac Kepo`okalani Hale Beach Park Improvements—FEMA PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Puna, Hawai`i Island On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> Principial Engineer to provide civil planning and design services to develop a park master plan and construction drawings to expand use areas
<br /> a. at the existing Isaac Hale Beach Park and enhance existing amenities to increase usability and utility for the community. Improvements include
<br /> on-site water system improvements; comfort station upgrades; on-site pedestrian access enhancements; parking improvements; generator
<br /> building upgrades; cultural preservation enhancements; landscaping improvements; and construction of a new administrative support building,
<br /> pavilions, and canoe building structure. Responsible for the preparation of a site development planning report, preparation of construction
<br /> documents for the site improvements, obtaining necessary permits and environmental clearances, project coordination, participation in
<br /> stakeholder meetings,and services during bidding and construction.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Pohoiki Boat Ramp Dredging of Volcanic Debris and Hazard PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Mitigation 2024 On-going
<br /> Puna, Hawai`i Island
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> b.
<br /> Principal Engineer responsible for planning, permitting, and design services to excavate and dredge volcanic debris and black sand from the
<br /> entrance channel and turning basin for the Pohoiki Boat Ramp. Duties included preparation of a Pre-Design Letter Report with recommendations
<br /> for dredging limits and depths, proposed hazard mitigation for erosion control, confirmation of required permits and agency approvals, and
<br /> engineering analysis; preparation of construction drawings, technical specifications, and cost estimate for the selected alternative; project
<br /> coordination;and services during bidding and construction.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Engineering Services for Waimanalo Residential and Subsistence PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Agricultural Lots On-going
<br /> Waimanalo, Hawaii
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X]Check if project performed with current firm
<br /> C. Principal Engineer for the development of 114 acres of Hawaiian Home Lands in Waimanalo into subsistence agricultural and residential lots for
<br /> native Hawaiian beneficiaries. Duties include environmental planning and research; utility research and analysis;conceptual design options for
<br /> subdivision layout, utility plan (water, wastewater, drainage, electrical, communication, and roadway), and mass grading plan; design of traffic
<br /> calming improvements(speed tables, street signage, pavement markings, and curb ramp improvements); preparation of NPDES NOI Form C
<br /> permit application; community outreach efforts including participation in community meetings and neighborhood board presentations; project
<br /> coordination;and services during bidding and construction.
<br /> (1) TITLE AND LOCATION(City and State) (2)YEAR COMPLETED
<br /> Kalaniana`ole Highway Sewer System Improvements PROFESSIONAL SERVICES CONSTRUCTION(If Applicable)
<br /> Honolulu, Hawai`i On-going
<br /> (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE [X] Check if project performed with current firm
<br /> d. Principal Engineer responsible for civil planning and design services for hydraulic improvements to the Kalaniana'ole Highway Trunk Sewer
<br /> System. Duties include interagency coordination to develop a Scope of Work;public outreach services including conducting interviews with area
<br /> residents and presentations at neighborhood board meetings; preparation of a Preliminary Engineering Report to investigate and evaluate
<br /> alternatives,including a separate gravity sewer system,stand-alone pump station,and individual Low-Pressure Sewer Systems(LPSS);hydraulic
<br /> evaluation; identification of necessary permits and clearances; preparation of construction drawings,technical specifications,and cost estimate
<br /> for the selected alternative;services during bidding and construction;and coordination with project team and government agencies.
<br /> STANDARD FORM 330(REV.7/2021)PAGE 2
<br />
|